Bigbog, Stradbally, Co. Laois
Planning application 20641
DecisionConditional grant
Decided26 January 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Laois County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Laois has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Bigbog, Stradbally, Co. Laois?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 17532Construction operation and decommissioning of a photovoltaic solar farm comprising photovoltaic panels on ground mounted frames, inverter stations, 1 no DNO/ Customer substation, switchgear substations, field transformers, auxiliary transformers, GRP cabinet, monitoring house communications building, single storey storage shed, battery containers, transformer containers, WC, fencing, temporary construction compound, access tracks, cabling, CCTV cameras, landscaping, creation of a new access and all associated ancillary development works. / 0.8 km away / 19 June 2018Granted
- 2560229Construct new domestic shed and all associated works / 0.8 km away / 11 June 2025Granted
- 2560237Amend the solar farm permitted under Laois County Council Reg. Ref. 17/532 and consists of a revised solar PV panel arrangement and maximum height of panels up to 3.2 metres; a reconfigured internal access route network; reduced number of MV transformers; provision of string inverters; revised CCTV arrangement; a spare parts storage container; weather stations; monitoring house; toilet facilities; and all other ancillary works associated with the development above and below ground including security fencing and gates, cabling, landscaping and drainage works. It is sought to increase the maximum export capacity of the solar farm to 80 MW and to increase the operational life of the solar farm from 30 to 40 years from the date of commissioning. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. / 0.9 km away / 16 June 2025Granted
- 2460005Amend planning permission Reg. Ref. 17532 to consist of: Replacement of permitted Distribution Network Operator (DNO) 110kV substation and all associated infrastructure (Glass Reinforced Polyester (GRP) Cabinet, monitoring house, storage shed, auxiliary transformer and WC) with an Air Insulation Switchgear (AIS) 110kV substation comprising a single-storey control building (c. 6.28m height and c. 133.7sqm) within a palisade-fenced compound (c. 2.6m height and c. 1,779.8sq.m) and all associated electrical infrastructure and apparatus, and realignment of permitted solar arrays. The proposed development will consist of: Construction of a new vehicular entrance and access track connecting to permitted internal vehicular tracks; Construction of an underground cable (c. 160m length) to provide a tail fed connection to the permitted 400kV Coolnabacky substation (An Bord Pleanála Case Ref. PL11.VA0015); and, All ancillary site development works, including lighting, drainage, temporary construction compound and on-site parking to serve the operational and maintenance needs of the substation. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application. / 1.0 km away / 21 May 2024Granted
- 21364Construct a dwelling house, waste water treatment system, percolation area, new splayed entrance and associated site work / 1.0 km away / 14 July 2021Granted
- 20502Retain domestic garage and associated site works / 1.1 km away / 11 November 2020Granted
- 19490Construct a new dwelling house, domestic garage, septic tank, percolation area, new bored well and new site entrance / 1.1 km away / 15 October 2019Granted
- 24149Extend time on planning permission 19/490 / 1.1 km away / 14 January 2025Granted