Cappakeel, Emo, Portlaoise Co. Laois
Planning application 21379
DecisionConditional grant
Decided16 July 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Laois County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Laois has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Cappakeel, Emo, Portlaoise Co. Laois?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20613Construct an extension to cattle shed, also construct concrete apron adjacent to the south-east side of the shed. / 0.0 km away / 18 January 2021Granted
- 1948Construct a dwelling house, domestic garage/fuel shed, septic tank with secondary treatment system and new entrance / 0.1 km away / 02 October 2019Granted
- 18379Construct a detached garage and associated ancillary works / 0.2 km away / 08 August 2018Granted
- 18689Renovate, extend and new waste water treatment system to cottage / 0.4 km away / 31 January 2019Granted
- 20320Construct a new dwelling house with garage, treatment system with percolation area, new well, new site entrance and all associated site works / 0.5 km away / 06 November 2020Granted
- 2560148Develop at this site within the Townlands of Morett, Killone, Cappakeel, Rossmore and Raheennahown north, Co. Laois. The development will consist of a 10-year permission and 40-year operational life for a solar farm on 5 no. land parcels as described herein: West Parcel (A) (Morett townland), Central West Parcel (B) (Morett & Cappakeel. townlands), Centre Parcel (C) (Morett & Cappakeel. townlands), Centre East Parcel (D) (Cappakeel townland) and East Parcel (E) (Rossmore townland). The total site area for the proposed development is c. 249 hectares and consists of the following; c. 1,796,838sq. metres of solar photovoltaic panels on ground mounted steel frames; 44 no. hardstandings for electrical skids and storage; underground power and communication cables and ducts; c. 22,753m. of boundary security fencing; c. 12,915m. of new and existing internal access tracks including 2 no. open span bridge crossings; associated drainage infrastructure; 5 no. site entrances which include the upgrading of 2 no. access points onto the L3930, 1 no. new access point onto the L7815 local road and 2 no. new access points onto the L3930 local public road; 5 no. temporary construction compounds; landscaping and biodiversity enhancement measures and all associated site services and works. Installations of internal network cable comprise trenching for an underground medium voltage electrical cable and associated joint bays and infrastructure, for a distance of approximately 7,189 metres in length along the solar farm lands including 4 no. Horizonal Directional Drilling points to traverse the Dunrally stream and the local roads L3930, L3901 and L3817. A separate planning application will be made to An Bord Pleanála as part of a Strategic Infrastructure Development (SID). This will include the provision of a 110kV substation with electrical control building and ancillary electrical infrastructure, associated compound with palisade fence which is to be located in the West Parcel (A) in the townland of Morett. The substation will connect to the national grid via. A LILO grid connection onsite. This planning application will be lodged with An Bord Pleanála in due course. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this planning application. / 0.6 km away / 18 September 2025Granted
- 21816Construct a new dwelling house with garage, treatment system with percolation area, new well, new site entrance and all associated site works / 0.8 km away / 31 January 2022Granted
- 2360426Build an agricultural unit to include grain store, machine shed and all associated site works / 1.2 km away / 29 November 2023Granted