Application description published by Laois County Council.
For works associated with the proposed uprate of the existing 110 kV Overhead Line (OHL) between the existing Cushaling 110 kV substation in the townland of Ballykilleen, Co. Offaly & the existing Portlaoise 110 kV substation in the townlands of Clonminam & Kylekiproe, Co. Laois. The replacement (“restringing”) of the existing overhead line circuit conductor with a new higher capacity conductor incl. installation of a new fibre communication connection; Replacement of 8 no. steel towers & their foundations; Replacement of steel members at 1 no. tower; Full tower painting required at 3 no. locations; Shear block remedial works (raise & cap) at 6 no. tower locations; Replacement of wooden poles only at 15 no. locations; Replacement of wooden poles & crossarm at 5 no. locations; Replacement of crossarm only at 14 no. locations; Replacement of existing danger notices at various locations, as required; Replacement of hardware and fittings, such as insulators, insulator hardware, earthwire hardware and anti-climbing guards at various locations as required; Replacement of suspension clamps, vibrations dampers and compression assemblies at all locations as required; All associates temporary site development works to gain access to the existing structures including clearance of vegetation, disassembly & reassembly of gate posts/piers & removal & re instatement of existing fencing; other temporary associated & ancillary development works required for the purpose of the existing circuit, including temporary items, such as; guard poles, construction compounds (located in the townlands of Bracklone, Tullaghan, Morett, Clonaddodoran and Kyletalesha), clearance or management of vegetation, installation of silt traps, silt fences, stone tracks, ground protections mats & watercourse crossings. No additional structures are proposed along the existing circuit. Structure 203,which will be relocated approx. 101m back towards structure 202 due to its existing position on top of a gravel mound & there being potential for subsidence of the gravel in the long term. No alteration to the nature, extent, alignment, character, or voltage of the existing electricity infrastructure is proposed. In addition, works to support this uprate also include the Cushlaing-Portlaoise 110KV bay lead-in conductor uprate at the Portlaoise 110KV station. A Natura Impact Statement (NIS) has been submitted with this application. Full description of all works within Site Notice.
Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.
PL-500151-LSSubmitted 29 October 2025 / decided 25 February 2026
No appeal document has been bound to this case yet; the timeline will enrich as indexing continues.
Decision details
Core application dates and identifiers from the public planning record.
Application ref
2560147
Received
24 March 2025
Decided
30 September 2025
FI requested
Yes
Authority
Laois County Council
Application type
PERMISSION
Outcome
Conditional grant
Source status
Documents indexed. Reason extraction for Laois has not started yet.
Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.
Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Laois has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.