50 Rushall, Shannon Road, Mountrath Co. Laois
Planning application 2560348
DecisionConditional grant
Decided05 September 2025
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Laois County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Laois has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 50 Rushall, Shannon Road, Mountrath Co. Laois?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560051Carry out amendments to a permitted residential development granted under ref. Pl ref 16/488. The proposed amendments will consist of a change of house type/design to sites 15-30 (inclusive) and amendments to rear gardens and associated parking / 0.0 km away / 27 March 2025Granted
- 2360418Constructconcrete post and panel fence to permanently close off a permitted pedestrian access between the Rush Hall Estate and Derrymore Gardens. The works include 2 visitor car parking spaces, footpaths, landscaping and all associated ancillary works / 0.0 km away / 23 November 2023Granted
- 18118Construct a new single storey extension to existing dwelling and associated site works / 0.1 km away / 19 April 2018Granted
- 2460714Develop 44No. Dwellings at Radharc Na Sleibhte, Mountrath, Co. Laois, consisting of the following: - 4No. 2 Bed Semi Detached 2 Storey Dwellings - 12No. 3 Bed Terraced 2 Storey Dwellings - 28No. 3 Bed Semi Detached 2 Storey Dwellings Development is to be accessed via existing estate road and is to include proposed internal roads and pathways, associated alterations to existing levels, site landscaping, boundary treatments, pedestrian access and all ancillary site development and excavation works, all on a site of 1.45Ha. / 0.1 km away / 23 July 2025Granted
- 20292Permission for a 49 unit development at Radharc Na Sleibhete, Mountrath, Co. Laois / 0.1 km away / 06 August 2020Granted
- 18251Construct a new vehicular and pedestrian access for the residential development granted permission under register reference 16/488. The previously approved access is via the existing Rush Hall Estate to the north of the subject site, which is proposed to be reconfigured and closed off. It is now proposed to provide a new vehicular and pedestrian access to the permitted development via Moonbaun Close and the R430 road located to the south west of the subject site / 0.2 km away / 08 March 2019Granted
- 16488Complete 22 partially completed residential units previously granted under planning register reference 04/60 and apply for permission to construct an additional 16 residential units. The entire proposed development will comprise of 38 no. residential units, consisting of 8 no. three bed semi-detached huses, 10 no. three bed terraced houses, 12 no. four bed semi-detached houses and 8 no. four bed end-terrace houses. The proposed development will be accessed from the existing Rush Hall Estate and the proposed development will also include estate rouds, footpaths, public open space, landscaping while utilizing existing ful drainage, surface water drainage and water mains and all associated infrastructure works and services on 1.666ha. / 0.2 km away / 22 November 2017Granted
- 22486Extend duration of time of planning permission 16/488 / 0.2 km away / 27 September 2022Granted