A c. 4.15 Ha site at Summerhill, Portlaoise, Co. Laois
Planning application 2560386
DecisionConditional grant
Decided13 January 2026
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Laois County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Laois has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near A c. 4.15 Ha site at Summerhill, Portlaoise, Co. Laois?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560387Provide 36 No. 4-bed, 2 No. storey houses.The development will also include: the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended as part of the Phase 2 application and extended as part of the Phase 2 & 3 applications; car parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground. / 0.1 km away / 12 January 2026Granted
- 2560385Construct 92 No. residential dwellings comprising 86 No. 4-bed houses and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the Link Road permitted as part of Phases 1A & 1B and its continuation through the Phase 2 site; minor amendments to the landscape and boundary treatment to the south of the Phase 1A site; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; pumping station; lighting; and all associated site and development works above and below ground. / 0.1 km away / 13 January 2026Granted
- 18546Construct a residential development at Aghnaharna, Portlaoise Co. Laois on a 0.49ha site ( 1.2 acre), within lands previously permitted under Reg Ref: 99/1404. The site is bounded by the Portlaoise Southern Circular road to the east, and by the existing residential development, Aghnaharna Drive to the north and west, and by lands subject to a current planning application reg ref.: 18/450 to the south. The development will consist of the removal of 6 partially constructed houses, the completion of the access road previously permitted and the provision of the following - 14 no two-storey houses in the following mix, 8 no. three -bedroom semi-detached type A units, 4 no. four-bedroom semi-detached type B units and 2 no. two-bedroom semi-detached Type C units together with all associated site development / car parking / landscaping / boundary detail works. Public Open Space to serve these units has been provided as part of the previously approved application / 0.2 km away / 21 August 2019Granted
- 18232Renovate and extend house consisting of a ground and first floor extension and include a single storey extension to the side and all associated works / 0.2 km away / 31 May 2018Granted
- 2360350Permission for development at this c. 2.14 Ha site at Summerhill, Portlaoise, Co. Laois. The site is generally bound to the north by the Portlaoise Southern Circular Road, to the east by Holy Family School Road, and to the west and south by undeveloped agricultural lands. Works are also proposed at O’Devoy (O’Deevy) roundabout comprising active travel infrastructure improvements to include the introduction of new shared pedestrian / cycle areas on the southern side of the Southern Circular Road and Aghnaharna Drive and improved pedestrian and cycle crossing facilities across the site access arm of this junction. Wastewater will be pumped via a rising main to discharge into the existing 450mm public wastewater sewer to the north-east at the O’Kelly roundabout. Potable water supply will be provided through a new connection to the existing 400mm public watermain on Aghnaharna Drive. The development site area, roadworks, and water and drainage works will provide a total application site area of c. 2.37 Ha. The development will consist of the provision of 45 No. residential dwellings comprising: 1 No. detached dwelling (three-storey 5-bed); 2 No. semi-detached corner dwellings (two-storey 4-bed); 18 No. semi-detached dwellings (two-storey 4-bed); 20 No. edge house t-shape dwellings (two-storey 4-bed); and 4 No. semi-dwellings (two-storey 3-bed). The development will also include: a new Link Road through the site, providing vehicular entrance/exit via O’Devoy (O’Deevy) roundabout; ancillary car parking spaces; public open space; boundary treatments; hard and soft landscaping; sub-station; pumping station; lighting; and all associated site and development works above and below ground. / 0.3 km away / 26 January 2024Granted
- 2560040Amend permission to the permitted Neighbourhood Centre building granted under LCC Reg. Ref. 23/60348, The development will principally consist of the minor revisions to the Neighbourhood Centre building, including internal layout changes, elevational changes and amendments to the roof profile. The development results in a reduction in the principal height of the Neighbourhood Centre building from 14.85 metres to 13.36 metres and a reduction in floor area from 1,484 sq m to 1,426 sq m. The development also proposes minor car parking layout changes; landscaping; and all other associated site works above and below ground. The development also proposes minor car parking layout changes; landscaping; and all other associated site works above and below ground. / 0.3 km away / 24 March 2025Granted
- 2360348Proposed works at O’Devoy (O’Deevy) roundabout comprising active travel infrastructure improvements to include the introduction of new shared pedestrian/cycle areas on the southern side of the Southern Circular Road and Aghnaharna Drive and improved pedestrian and cycle crossing facilities across the site access arm of this junction. Proposal for the removal of the redundant western arm of the roundabout to the southeast at the Holy Family School Road and the provision of new active travel infrastructure incorporating a two-way cycle track with the adjoining footpath along the eastern boundary which transitions to a shared pedestrian / cycle facility to the north as it approaches the O’Kelly roundabout, and continues on the southern side of Aghnaharna Drive on the western arm of this roundabout. Wastewater will be pumped via a rising main to discharge into the existing 450mm public wastewater sewer to the north-east at the O’Kelly roundabout. Potable water supply will be provided through a new connection to the existing 400mm public watermain on Aghnaharna Drive. A pumping station is proposed southwest of the main development site. The development site area, roadworks, water and drainage works, and pumping station will provide a total application site area of c. 3.39 Ha. The development will consist of: a 2 No. storey Neighbourhood Centre (1,484 sq m) principally comprising a retail unit 361 sq m), a creche (289 sq m), refuse storage (23 sq m) and cycle storage (65 sq m) at ground floor level and office floorspace (746 sq m) at ground and first floor level; the provision of 57 No. houses (comprising of: 5 No. detached dwellings (three-storey 5-bed); 3 No. semi-detached corner dwellings (two-storey 4-bed); 29 No. semi-detached dwellings (two-storey 4-bed); 20 No. edge house t-shape dwellings (two-storey 4-bed); and 5 No. 3 No. storey duplexes comprising 5 No. 2-bed units and 5 No. 3-bed units. The development will also include: a new Link Road through the site, providing vehicular entrance/exit to the site via O’Devoy (O’Deevy) roundabout; roof plant at the Neighbourhood Centre; ancillary car parking spaces; public open space; boundary treatments; hard and soft landscaping; sub-stations; lighting; and all associated site and development works above and below ground. / 0.3 km away / 27 March 2024Granted
- 2220(1) change orientation of 2No. Semi-Detached (Type A) Houses 97 & 98 (Approved under Planning permission 17-396); (2) change boundary treatment of Plot 99 / 0.3 km away / 08 March 2022Granted