Coillte, Tullyskeherny, Rossinver
Planning application 1816
DecisionConditional grant
Decided17 January 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Leitrim County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Leitrim has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Coillte, Tullyskeherny, Rossinver?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20104(a) demolish 10m2 of existing cottage, (b) add a 2 storey extension to the existing cottage; (c) move existing septic tank 4m west current location; (d) install a gravity fed soil polishing filter, (e) all other site development work; (e) retention permission for the existing Bord na Mona Peat modules; (f) in accordance with the provision of section 177(6) of the planning and development act 2000 (as amended), an NIS (Natura Impact Statement) will be submitted to the planning Authority in connection with this application / 1.0 km away / 09 October 2020Granted
- 17201For development. The works shall consist of (1) The construction of a new two storey dwelling house (2) The renovation of an existing derelict cottage into a domestic garage and stores (3) The upgrade of the existing access onto the R281 Public Road (4) Sight Line improvement works including the removal of existing hedgerow, levelling of existing ditch and erection of new road side boundary fence on lands adjacent the property (5) The installation of a mechanical aeration system and polishing filter, together with associated site development works, works to site boundaries and services / 1.3 km away / 18 September 2018Granted
- 20105Extend an existing agricultural shed. The proposed shed will be a slatted / dry bedded agricultural building, and all associated ancillary works / 1.5 km away / 10 March 2021Granted
- 1951Extend an existing agricultural shed. The proposed shed will be a slatted / dry bedded agricultural building, and all associated ancillary works / 1.6 km away / 02 May 2019Granted
- 2363Retention of three Velux roof window / 1.6 km away / 21 June 2023Granted
- 2518Reduced site boundaries to that shown on the original retention planning application, No 09/436. Construct a new clay ditch, 0.8 m high and set back 3m from the edge of the existing roadside boundary to the front roadside boundary in Lieu of the stone wall required under condition 6, (a) of planning reference No. P.09/436 / 1.7 km away / 12 November 2025Granted
- 2560142(1).Demolition of existing outbuildings and rear extension to the existing dwelling (2).Refurbishment of existing dwelling including alterations to existing windows. (3).Construction of a part 2 storey and part single storey extension. (4).Upgrade of the existing waste water treatment system to current EPA Code of Practice, together with all associated ancillary works. / 1.9 km away / 28 July 2025Granted
- 24601691. To construct a storey and a half type domestic dwelling, 2. To construct a domestic garage, 3. To construct a new site entrance, 4. To construct a domestic waste water treatment system to current EPA Code Of Practice standard together with all ancillary works / 2.3 km away / 10 October 2024Granted