GrantedDecided 10 December 2019Leitrim County Council

Townlands detailed above,

Planning application 1926
DecisionConditional grant
Decided10 December 2019
Application typePERMISSION
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Leitrim County Council.
A thirty year planning permission for an additional four (4) wind turbines to an existing fifteen (15) turbine windfarm. The proposed development will constitute the following: (a) the construction of four (4) wind turbines with hub heights of up to 92 metres with an overall height of up to 150 metres to blade tip.; (b) the construction of crane hardstand areas located beside each turbine; (c) the construction of two (2) 20 Kv substation buildings with associated electrical plant, equipment and security fences; (d) Internal windfarm underground cabling; (e) the construction of new site access tracks and the provision of upgraded access roads; (f) Installation of a drainage system for the proposed hardstand and road areas; (g) Underground grid connection approximately five (5) Km in length, predominantly along existing public road network; (h) all associated site development and ancillary works. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and by a Natura Impact Statement in lieu of a thirty year planning permission for an additional six(6) wind turbines to an existing fifteen (15) turbine windfarm in the townlands of Lackagh, Tullynamoyle, Gowlaun and Altavra, Killarga, County Leitrim. The grid connection to Corderry Substation will be located in the townlands of Knockacullion, Tawnahoney, Lisnagowan, Tawnylea, Derrintawny, Shivdelagh, Cloonagh, Drumduffy and Corderry, Killarga County Leitrim. The proposed development will constitute the following: (a) the construction of six (6) wind turbines with hub heights of up to 92 metres with an overall height of up to 150 metres to blade tip.; (b) the construction of crane hardstand areas located beside each turbine; (c) the construction of two (2) 20 Kv substation buildings with associated electrical plant, equipment and security fences; (d) Internal windfarm underground cabling; (e) the construction of new site access tracks and the provision of upgraded access roads; (f) Installation of a drainage system for the proposed hardstand and road areas; (g) Underground grid connection approximately five (5) Km in length, predominantly along existing public road network; (h) all associated site development and ancillary works. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and by a Natura Impact Statement.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.
ABP-306379-20Submitted 14 January 2020 / decided Not recorded
Status not recordedWITHDRAWN
No appeal document has been bound to this case yet; the timeline will enrich as indexing continues.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Leitrim has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Townlands detailed above,?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →