Main Street, Dromahair, Co Leitrim
Planning application 2143
DecisionConditional grant
Decided28 April 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Leitrim County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Leitrim has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Main Street, Dromahair, Co Leitrim?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360105(1) erect a new sign to the front of the building;(2) construct a single storey extension to the side of the building; (3) demolish two number storage sheds; (4) construct a Mens shed/Storage shed; (5) change the use of an existing Garda Barracks to a community usage center and all ancillary works / 0.1 km away / 20 November 2023Granted
- 171321. Change the use of part of former hotel to sit down/take away restaurant use. 2. Amend the internal floor areas to allow for revised usage. 3. Amend the front elevation to allow for revised usage 4. Erect a new shop front 5. Convert a section of the existing hotel bedroom space into living accommodation 6. Connect to the existing sewer and water networks and all ancillary works / 0.1 km away / 08 February 2018Granted
- 1858Construction of a two storey extension at the side of existing dwelling house / 0.1 km away / 24 May 2018Granted
- 2360127(1). retain the existing one storey domestic extension to the rear of the existing dwelling.(2). To retain the 2 number existing bedrooms in converted roof space. (3). To retain all elevational changes and all ancillary works. / 0.1 km away / 14 December 2023Granted
- 2560305Rear extension and renovation to existing dwelling including alterations to existing front porch and change to existing windows at no. 7 Abbeyvale, Dromahair, Co. Leitrim. / 0.2 km away / 03 February 2026Granted
- 19196(a) construct two number semi detached two-storey type domestic dwellings; (b) construct two number site entrances, connect to the existing public sewer mains and all associated ancillary works / 0.2 km away / 02 December 2020Granted
- 22176Convert existing vehicular site entrance into a pedestrian entrance. To construct a new vehicular site entrance and all ancillary works / 0.2 km away / 11 October 2022Granted
- 2460117Planning permission to retain the as constructed layout and changes to planning permission PL22/138. Including the following changes: (1) First Floor changes: 2-bedroom suite to 2no. 1 bedrooms and associated changes to access and internal layout, a bedroom to a kitchen, (2) Ground Floor changes: new corridor through 2-bedroom suite and change to access to suite, kitchen and bedroom in managers suite swapped, laundry room changed to computer room and new ESB Room, all associated changes. (3) Upper Basement Changes: new corridor through 3-bedroom suite and internal changes, staff toilet and store amalgamated into a laundry room, location of internal stairs, all associated changes. (4) Lower Basement Changes: open plan kitchen and dining area with toilets and upper sitting area and ESB room in lieu of 2no. 3-bedroom suites and laundry room and all associated changes. (5) All other minor internal changes, (6) Fenestration changes at basement levels to side and rear elevations. (7) Changes to retaining wall and ground level to side with ramps from car park (8) all ancillary site works at the Abbey Manor Hotel, Main Street, Dromahair, Co. Leitrim, F91 AT22. This is a protected structure / 0.2 km away / 14 May 2025Granted