Garvagh Glebe, Dromahair, Co Leitrim
Planning application 2285
DecisionConditional grant
Decided08 July 2022
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Leitrim County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Leitrim has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Garvagh Glebe, Dromahair, Co Leitrim?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 202Development consisting of an existing lattice type temporary meteorological mast 80m in height and associated instrumentation and works and the continuation of its use to measure local climate conditions for a period of a further five years / 1.7 km away / 09 March 2020Granted
- 17148Amend the site boundaries granted under Planning Ref. P12147 for an existing domestic house. Also to retain the dwelling and all elevational amendments / 1.7 km away / 10 October 2017Granted
- 2360168Will consist of the retention of the dwellinghouse, septic tank and percolation area. / 1.9 km away / 14 February 2024Granted
- 20251PP - for development consisting of a ten-year planning permission for a renewable energy development with a 30-year operational life (from the date of commissioning along with a recreational and amenity facility. The entirety of the renewable energy development constitutes the provision of a ten-turbine wind farm and associated site works on lands in both Counties Leitrim and Sligo. The development will consist of: i. Construction of 2 no. wind turbines with a maximum overall blade tip height of up to 170 metres and associated hardstand areas; ii. 1 no. permanent Meteorological Mast with a maximum height of up to 100 metres, iii. All associated underground electrical and communications cabling connecting the turbines to the proposed wind farm 38kV electricity substation (which is proposed to be located in the townland of Garvagh Glebe, Co Leitrim); iv. Upgrade of existing tracks, roads and provision of new site access roads; v. Recreation and amenity works, including marked trails and associated recreation and amenity signage; vi. Site drainage; vii. Permanent signage; viii. Ancillary forestry felling to facilitate construction and operation of the proposed development; and ix. All associated site development works. A concurrent planning application is being lodged with Leitrim County Council in relation to the elements of the project that are within County Leitrim (which include the provision of 8 no. wind turbines, electrical substation, underground cabling, connection to national electricity grid, access tracks/roads, access junction improvements, amenity works and all associated works). An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted with the application. / 2.7 km away / 15 June 2021Granted
- 17211Construction of a new forestry access entrance to an existing mature forestry and all ancillary works / 2.8 km away / 02 August 2018Granted
- 20120Development located in the townlands of Bargowla, Boleymaguire, Braudphark, Derreens, Derrybofin, Derrycullinan, Derrycullinan Beg, Drummanacappul, Garvagh, Garvagh Glebe, Glassalt, Lisfuiltaghan, Seltan, Sheena and Tinnybeg, County Leitrim consisting of: (a) Construction of 8 No. Wind turbines with a maximum overall blade tip height of up to 170 metres, and associated hard-stand areas; (b) 1no. 38kV permanent electrical substation including a control building with welfare facilities, all associated electrical plant and equipment, security fencing, all associated underground cabling, waste water holding tank and all ancillary works; (c) all associated underground electrical and communications cabling connecting the turbines to the proposed wind farm substation; (d) all works associated with the connection of the proposed wind farm to the national electricity grid, via underground cabling to the existing Garvagh substation; (e) upgrade of existing tracks and roads, provision of new site access roads and hard-stand areas; (f) the partial demolition and alteration of two agricultural buildings in the townlands of Sheena and associated junction access and road works to the existing yard, agricultural buildings and agricultural lands in the townlands of Sheena and Derrybofin to provide link road primarily for construction traffic off the R280. this link road will be for the delivery of abnormal roads to the site during the construction period and may be used during the operational period if necessary or to facilitate the decommissioning of the wind farm. Following construction, access to the link road will be closed off and the yard / agricultural building will revert to its use for agricultural purposes except if and when required for delivery of abnormal loads during the operation period of the wind farm or to facilitate the decommissioning of the wind farm (g)1 no. borrow pit; (h) 2 no. peat and spoil repository areas; (i)2 no. temporary construction compounds; (j) recreation and amenity works including marked trails, boardwalk and viewing area, provision of a permanent amenity car park, and associated recreation and amenity signage; (k) site drainage; (l) permanent signage, (m) ancillary forestry felling to facilitate construction and operation of the proposed development and (n) all associated site development works. An Environment Impact Assessment Report (EIAR) and a Natura Impact Statement have been prepared in respect of the proposed development / 3.0 km away / 15 June 2021Granted
- 2560109Retention of the amended site boundaries as granted under planning permission Ref P.04/1624.Retention of an amended domestic wastewater treatment system installed to that approved under planning permission Ref P.04/1624. Retention of the as built flat roof dining room extension on the north-west elevation of the dwelling. / 3.1 km away / 01 July 2025Granted
- 17210Construction of a new forestry access entrance to an existing mature forest and all ancillary works / 3.1 km away / 02 August 2018Granted