Mountain View, Drumshanbo Td, Drumshanbo
Planning application 2342
DecisionConditional grant
Decided18 May 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Leitrim County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Leitrim has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Mountain View, Drumshanbo Td, Drumshanbo?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 26600421. To construct a total of 7 no. residential units consisting of a) 2 no. 2-storey terraces with 3 no. 2-bed houses each, and b) 1 no. 5-bed, 2-storey detached house. 2. To construct car parking, landscaping, connections to all public services and all ancillary works. / 0.0 km away / 08 April 2026Granted
- 1942(1)Planning Permission is sought to carry out alterations and extension to existing single storey dwelling. The proposed development consists of (a) provision of new first floor level with an additional floor space of 66m2 resulting in the dwelling height being increased from 5.5m to 7.25m; (b) new front porch 1.2m2 and (c) modifications to existing ground floor front windows and all associated works and (2) Permission is sought to retain garden shed in lieu of Planning Permission for development consisting of alterations and extension to existing single storey dwelling. The proposed development consists of (a) provision of new first floor level with an additional floor space of 66M2 resulting in the dwelling height being increased from 5.5M to 7.25M; (b) new front porch 1.2M2 and (c) modifications to existing ground floor front windows and all associated works / 0.1 km away / 07 August 2019Granted
- 2460222Planning Permission for development at Ballinamore Road, Drumshanbo, Co Leitrim, consisting of the provision of Sports facility consisting a Football/soccer pitch, with perimeter fencing containing Basketball court, Volleyball court, Rounders pitch, 6 Lane 200m long running track, with perimeter floodlighting and lamp posts including the provision changing/shower/toilet facilities with pedestrian access from the existing pathway located in adjoining school grounds including connection to all existing services and ancillary works, as per drawings and documents lodged to Leitrim County council. / 0.4 km away / 03 November 2025Granted
- 2460216(1).The dismantling and removal off-site of the existing prefabricated classrooms including all hard-standings and bases to the North Western elevation of the existing school; (2). The demolition and removal off-site of the existing detached storage shed to the rear of the existing school; (3).The provision of a single storey extension onto the existing standalone classroom located to the Northern rear elevation of the existing school constructed as per Previous Grant of Permission P.12/209. The proposed extension shall consist of provision of an entrance lobby, 2 No. classrooms and Unisex Toilet/Shower for Assisted Users to the Eastern side elevation of the existing standalone building and entrance lobby and Storage room to the western side elevation of the existing standalone building including all necessary alterations, connection to all existing services and associated ancillary works; (4).The provision of a single storey link corridor connecting the proposed extension to the existing school including all associated ancillary works; (5).The conversion of existing Classroom No. 9 to a Special Education Needs room with provision of access corridor to the existing school including all necessary alterations and associated ancillary works; 6).The provision of a sensory garden to the Southern elevation of the existing school including alterations to the site layout and revised site boundaries with reference to previous Grant of permission P.19/56 as per drawings and documents lodged to Leitrim County Council at Ballinamore Road, Drumshanbo, Co. Leitrim, N41PY61 in accordance with the documents lodged / 0.5 km away / 16 January 2025Granted
- 18103(a) construct a two storey type extension to the rear, (b) construct a single storey type extension to the rear, (c) make amendments to the existing South & East elevations and all ancillary works / 0.5 km away / 18 July 2018Granted
- 2460206A) Single storey Side and Rear extension b) front porch, c) First floor extension complete with roof construction, d) new rear garden pergola, e) new domestic car garage & fuel store shed. / 0.5 km away / 09 December 2024Granted
- 20161For following development: 1. To retain extension to the Eastern elevation of the existing two storey dwelling house. 2. To retain existing detached studio/home office. 3. To retain existing domestic storage/fuel storage shed / 0.5 km away / 16 November 2020Granted
- 20225For 1) Renovation of, and demolition works to existing food production building 2) Construction of extensions (308.5m2) to the sides and rear of existing food production building providing for increased food production areas, ancillary offices and sanitary facilities 3) Construction of a new two storey extension (617.3m2) to the front of the existing food production building consisting of training areas/offices/canteen and sanitary facilities 4) Construction of a new ESB substation on site 5) Works to existing boundaries, internal roads network, car parking and lighting 6) Erection of a new signage to the front of the building and roadside. All the above, together with connection to existing public services and all associated site works / 0.6 km away / 23 February 2021Granted