Eir Exchange Saint George’s Terrace, Townparks, Carrick-on-Shannon County Leitrim
Planning application 2460158
DecisionRefused
Decided30 September 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Leitrim County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Leitrim has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Eir Exchange Saint George’s Terrace, Townparks, Carrick-on-Shannon County Leitrim?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 243(1) retention of the first floor level bar extension to the rear of the existing licenced premises and stairway leading to same and (2) permission is sought to enclose the currently open section of the rear elevation of the first floor bar level with noise reducing double glazing and noise reducing wall and roof insulation to the first floor bar extension to be retained / 0.2 km away / 15 April 2024Refused
- 1774For change of use for existing ground floor retail unit Number 2 together with a portion of adjoining retail unit Number 3 to provide a one bedroom apartment, all contained in existing courtyard setting to rear of mixed use building known as Bush House which is a protected structure adjacent to the Bush Hotel / 0.2 km away / 13 June 2017Refused
- 2360226Permission for renovation of existing two storey detached house with conversion of attic to include dormer to the rear, a two storey over basement extension to the side of existing dwelling with amendments to all elevations, the demolition of existing garage and new relocated garage, relocation of entrance, with amendments to existing front boundary wall & ancillary site works at / 0.5 km away / 24 January 2024Refused
- 21133To construct 2 no. detached two storey dwelling houses, connection to services, access onto the public road for each dwelling with associated site development works at / 0.8 km away / 06 May 2021Refused
- 22256Permission for construction of a dwelling house, domestic garage/shed, connection to services, access onto the public road and associated site development works at / 0.9 km away / 26 September 2022Refused
- 22643Permission for construction of a dwelling house, domestic garage/shed, connection to services, access onto the public road and associated site development works at / 0.9 km away / 07 February 2023Refused
- 20177For construction of dwelling house, domestic garage/shed, connection to services, access onto public road and associated development works at / 0.9 km away / 17 July 2020Refused
- 1799For development on a site of 1.0 hectare on lands bounded by the N4 and Circular Road in the townlands of Attifinlay & Attyrory, Carrick on Shannon. The Development will consist of: the construction of a two storey, licenced foodstore with ancillary off-licence sales, measuring 2,874 sqm gross, internal area and 1,684 sqms of net sales space; the provision of one free standing totem sign, one poster display board, 3 no. external wall signs and two other external signs; trolley bay shelter; the provision of external car parking and cycle parking; the provision of a vehicular and pedestrian access via the Circular Road and the provision of boundary treatments, retaining walls, hard and soft landscaping, lighting, connections to drainage and water services and all other ancillary site and associated development works, including the creation of a flood compensation area / 1.0 km away / 12 July 2017Refused