Willow Bank, Mountshannon, Lisnagry Co Limerick
Planning application 17362
DecisionConditional grant
Decided15 June 2017
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Willow Bank, Mountshannon, Lisnagry Co Limerick?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 211311House extension to the front, side and rear of the existing house; completion of the front boundary wall; alterations to the existing entrance piers and gate; and all ancillary site development works / 0.3 km away / 13 July 2022Granted
- 221311Retention of alterations to site boundaries from planning file ref. 15/575 / 0.3 km away / 09 February 2023Granted
- 21305The smoking shelter to side of existing building with all ancillary site works / 0.4 km away / 06 May 2021Granted
- 2561035High-power electric vehicle charging points and associated infrastructure consisting of the following: I. Installation of 8no. electric vehicle charging bays with 8no. Tesla illuminated charging units and associated signage, II. Installation of proposed Tesla supercharger power cabinet equipment, III. Installation of proposed modular substation, IV. Erection of associated EV signage, V. Construction of proposed retaining wall, VI. All associated site development works including line marking / 0.4 km away / 03 December 2025Granted
- 20805Upgrade of existing domestic waste water treatment system, replacing existing soil filter with eco-flo filter / 0.4 km away / 08 October 2020Granted
- 211560Demolition of existing one storey dwelling house consisting of kitchen, living and bedroom areas and site entrance / 0.4 km away / 16 March 2022Granted
- 177031Extension of Permission from Ref No:11/957 (montessori school and afterschool, site entrances, drop off area, waste water treatment works and all associated site works) / 0.6 km away / 19 October 2017Granted
- 2460044Summer/winter sun lounge extension to the rear of the house / 0.6 km away / 14 March 2024Granted