University Hospital Limerick, St. Nessans Road, Dooradoyle Co. Limerick.
Planning application 17687
DecisionConditional grant
Decided08 September 2017
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near University Hospital Limerick, St. Nessans Road, Dooradoyle Co. Limerick.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 22796A 803m2, two storey extension to the existing hospital, incorporating 14 No. bedrooms with en-suites, staff bases, toilets, support rooms and plant space, connection to the existing hospital street and associated internal modifications, and all other associated site works. The application is located within an Architectural Conservation Area and there is an existing Protected Structure on the Hospital Campus (PS Reg No. 1649 Ref No S.E. 30- Hospital Chapel). No works are proposed to the Protected Structure as part of this application / 0.1 km away / 12 September 2022Granted
- 2560249Development at the University Hospital Limerick, St. Nessan’s Road, Dooradoyle, Limerick, V94F858. The application site is principally bounded by an existing internal access road to the north; by the existing Emergency and Renal Departments and associated inpatient wards above to the south; by the existing hospital to the east and by St. Nessan’s Road to the west. The Hospital Chapel within the Hospital Campus is a Protected Structure (RPS. Reg. 1649). No works are proposed to the Protected Structure as part of this application. The development will consist of a rooftop extension to the Shell extension granted under Reg. Ref. 23/60506, comprising an enclosed plant at Level 02 and a 4 storey ward above at Levels 03, 04, 05, and 06, consisting of 96 no. acute inpatient bed spaces, landscaped outdoor amenity areas (Level 03), support services, staff amenities, offices, storage and other ancillary areas, in addition to a roof plant at Level 07. The proposed development will connect and integrate with the permitted 96 no. bed ward to the south granted under Reg. Ref 20/775 which is currently under construction. As a result of the extension, the permitted building height on the subject site, as approved under Reg. Ref. 23/60506, will increase from c. 12m to a maximum height of c. 37m (top of staircore) along St. Nessan’s Road. The development will also include amendments to the permitted Shell extension (Levels -02, -01, 00 and 02) granted under Reg. Ref. 23/60506, comprising: alterations to Level 02 (roof) to accommodate the provision of plant at Level 02; removal of a ventilation well to the basement car park; relocation of the pedestrian and cyclist access to the basement at Level -01 from the north elevation to the west elevation; relocation of a fire escape door from the east elevation to the north elevation; the addition of an external column for structural support; minor alterations to all elevations including the rearrangement of windows and louvre openings and changes to materials and finishes. The development will also include: covered and uncovered bicycle parking spaces at various locations throughout the campus; the provision of a new shared pedestrian and cyclist link located to the north of the campus connecting to St. Nessan’s Road; green roofs; plant; changes in levels and all associated ancillary site development above and below ground / 0.1 km away / 20 May 2025Granted
- 23383A single-storey extension to Radiology Department, including an interstitial plantroom floor above the existing Radiology Department, a bridge link connecting to the existing building, an extension to the existing MRI building at ground level, a stair core connecting the existing Radiology with the extension, along with supporting services, associated site works and associated ancillary works. The proposal includes modifications to internal layouts and fitout. The site is located within an Architectural Conservation Area and there is an existing Protected Structure on the hospital campus. No works are proposed to the Protected Structure in this application / 0.1 km away / 08 September 2023Granted
- 2360506Development at the University Hospital Limerick, St. Nessan’s Road, Dooradoyle, Limerick, V94F858. The application site is principally bounded by an existing internal access road to the north; by the existing Emergency Department and Renal Department to the south; by the existing hospital to the east and by St. Nessan’s Road to the west. The Hospital Chapel within the Hospital Campus is a Protected Structure (RPS. Reg. 1649). No works are proposed to the Protected Structure as part of this application. The development will consist of: demolition of the existing pedestrian access ramp and generator compound; the provision of a new double basement car park and the commencement of car parking use at the basement levels (Level -2 and Level -1); the provision of a department shell comprising medical floorspace at ground floor level (Level 0) and first floor level (Level 1) (c. 5,462 sq m); the provision of 2 No. stair cores which will provide access to all proposed floor levels (Level -2 to Level 1) and to facilitate access to future upper levels; and the provision of hospital streets connecting the department shell to the existing hospital. The proposed development has a total gross floor area of c. 11, 262 sq m (including basement) and will link to, and integrate with, the existing University Hospital Limerick. Access to the basement will be via the existing basement car park to the south, which connects to the existing main entrance of the Hospital Campus. Construction access will be via the main roundabout on St. Nessan’s Road. Construction traffic will temporarily exit the subject site from the existing emergency gate which will be widened to enable same (or from a location nearby by this gate). The boundary gate and railings to be fully reinstated when the works are complete. The development will also include: 131 No. additional basement car parking spaces (including EV spaces with charging points); minor reconfiguration works at the interfaces between the existing hospital and the proposed development; the provision of bicycle parking and minor alterations to the car parking layout within the basement levels of the adjacent Emergency Department and Renal Department; removal of the vehicular access to Out Patient Department (relocated to the main hospital entrance from St. Nessan’s Road) to facilitate means of escape from the extended hospital street and to facilitate th / 0.1 km away / 08 September 2023Granted
- 17749Proposed antennas, link dishes, associated equipment, equipment cabinet, and ancillary works at rooftop level at University Hospital Limerick, St. Nessan's Road, Dooradoyle, County Limerick. The proposed location is in an Architectural Conservation Area within the curtilage an existing Protected Structure "the Hospital Chapel" in the Hospital Campus. The existing protected structure will not be altered or affected by the proposed works. The proposed development will form part of Vodafone Ireland Ltd's existing 3G/4G Broadband telecommunications networks / 0.1 km away / 27 September 2017Granted
- 191178The installation of a relocatable MRI unit and a link corridor for patient access from the existing adjacent Radiology Department along with associated minor adjustments to the existing adjacent buildings. The application is located within an Architectural Conservation Area and there is an existing Protected Structure on the Hospital Campus (Hospital Chapel). No works are proposed to the Protected Structure as part of this application / 0.1 km away / 28 January 2020Granted
- 2460376The Application that is located within an Architectural Conservation Area and there is an existing Protection Structure on the Hospital Campus (RPS Reg No. 1649 Ref No S.E. 30 Hospital Chapel). No works are proposed to the Protected Structure as part of this application. The proposed development will consist of the removal of existing temporary portacabins from within the internal courtyard and the erection of Emergency Accommodation Unit comprising of 2 separate extensions, 2 storey each. The smaller extension will consist of: (a) Future medical use at ground level, (b) Staff changing areas at first floor level. The larger extension will consist of: (a) Further medical use spaces at ground floor level, (b) 16 no single bedrooms; pantry; nurses base; admin areas; clinical support spaces, and sanitary facility at first floor level, (c) Roof plant room. The development will also include a provision of 18no additional car parking spaces and all associated site works / 0.1 km away / 12 June 2024Granted
- 17432The alteration & extension of the existing Acute Medical Assessment Unit located within the Out Patient's Building along with minor modifications to the original hospital facades including the extension of an existing temporary building. The application site is located within an Architectural Conservation Area and there is an existing protected structure on the Hospital Campus (Hospital Chapel), No works are proposed to the protected structure as part of this application / 0.1 km away / 06 July 2017Granted