Tait House, Collins Avenue, Roxboro Road.
Planning application 17885
DecisionConditional grant
Decided21 December 2017
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Tait House, Collins Avenue, Roxboro Road.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20829Change of use for an existing single storey building from use as a workshop to use as an after school facility, minor alterations to the existing single storey building. The proposed works are in proximity to Southill House, a protected structure(RPS 1637) / 0.1 km away / 15 October 2020Granted
- 172631. Reinstatement & widening of original 19th C. entrance gateway from public road, 2. Repair of original boundary wall flanking public road, 3. Construction of new car park and associated works (This is a protected structure No. RPS 1637) / 0.1 km away / 26 October 2017Granted
- 2561294The conversion of existing domestic shed to living accommodation with the construction of a raised new roof, the construction of a new extension to the rear of existing house, and the construction of a new rear porch and all associated site works / 0.2 km away / 09 February 2026Granted
- 21834The installation of a temporary up-cycled pre-fabricated painted shipping container accommodating a changing room facility to the northern boundary of Southend United AFC on lands in the ownership of Limerick City and County Council. The temporary container will internally house timber perimeter benching and clothes hangers and will be supported on pad foundations / 0.3 km away / 07 October 2021Granted
- 2461252Alterations to existing car entrance and pedestrian entrance and propose to construct a new exit for cars only, and associated site works / 0.3 km away / 29 April 2025Granted
- 22746The construction of entrance lobby to the front of the existing shop. Retention permission for increased retail/storage area to the existing shop as constructed together with all associated works / 0.3 km away / 17 May 2023Granted
- 2460796The alteration of the existing building and will include the following works: i. Amended position of the existing vehicular & pedestrian entrance at Donogh O’Malley Park ii. Widening of existing road access at Donogh O’Malley Park including alteration of footpath and public lighting iii. External signage iv. Alteration of existing façades & roof areas v. Erection of external fixed canopy areas vi. New car-parking area with 35 no. car spaces, including 8 no. disabled access spaces. vii. New ancillary site structures to include a bicycle parking shelter, refuse store & services building viii. Site landscaping, boundary treatments and ancillary site works including amendments to widen & extend pedestrian footpaths adjacent to the site / 0.4 km away / 19 December 2024Granted
- 2460297(a) 1no. 1MW electrical substation measuring approximately 4.6m L x 2.5m W x 2.9m H; (b) 4no. electric vehicle charging points (2No. 180kw units and 2No. 300kw units) measuring approximately 0.8m L x 0.8m W x 2.4m H; (c) 2no. vehicle dispensers measuring approximately 0.6m L x 0.5m W x 2.4m H; (d) 12no. impact protection bollards measuring approximately 0.4m diameter and 1.2 high (two bollards per charging point); and, (e) All ancillary site development workings, including site preparation works, hardstanding, underground cabling and landscaping, as required to facilitate the development / 0.4 km away / 29 May 2024Granted