21-28 Cois Carraig, Clarina, Co. Limerick.
Planning application 17977
DecisionConditional grant
Decided13 December 2017
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 21-28 Cois Carraig, Clarina, Co. Limerick.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 1933A single storey clubhouse and all associated services / 0.1 km away / 13 March 2019Granted
- 177035Extension of Duration from Ref No: 15/221 (the completion of the construction of 48 no. retirement houses currently in various states of construction along with associated site works. The 48 no. units were originally granted planning permission under 99/2676 (which was extended under 12/7106 until 2017) and construction commenced with amendments to the principal permission under 07/1252 & 07/3472) / 0.1 km away / 15 September 2017Granted
- 2561187The construction of a dormer dwelling house, garage, entrance, connect to public services and associated site works / 0.1 km away / 13 March 2026Granted
- 21757Demolition of two storey extension to rear and outbuildings, construction of single storey extension to rear and detached single storey domestic shed and covered patio to rear, new window to side(east) at ground floor level, new window to side(west) at ground floor level and two new windows to rear at first floor level and all ancillary site works / 0.1 km away / 21 July 2021Granted
- 1711041. demolish existing front porch. 2. demolish lean to garage to side. 3. demolish flat roof extension to rear. 4. construct new storey and a half extension to rear of existing dwelling. 5. carry out internal alterations to existing dwelling including all associated site services and works / 0.1 km away / 30 January 2018Granted
- 17591Change surface finishes at some locations mainly from brick paving to an asphalt surface and from self binding gravel to mainly grass and shrub beds on housing development previously approved under file reference No 15/221 & 15/813 / 0.1 km away / 09 November 2017Granted
- 2460485The renovation of and construction of a one and a half storey extension to the rear and side of existing dwellinghouse, including raising roof height of existing house together with all associated site works / 0.1 km away / 15 July 2024Granted
- 177034Extension of Duration From Ref No:15/813 (modifications and amendments to 99/2676 (extended under 12/7106) including; (1)(a) a change in the number, type, design and layout of residential units from 19 no. townhouses and 20 no. apartments (39 no. total) to 36 no. semi-detached units and 3 no. detached units; (b) revised public open space layout arrangement; (c) provision of cycle lanes and landscaping along the internal distributor road; (d) reconfiguration of car parking and access arrangements around that part of Market Hall which has been constructed to date (1 no. retail unit, 1 no. office and 14 no. apartments) and (e) all associated site works. (2) omission of a number of permitted structures including the meeting hall, communal hall and the remainder of Market Square (comprising 1 no. restaurant, 5 no. retail units, 13 no. offices and 23 no. apartments and town houses) which has not been constructed to date (the application includes an overall masterplan for the site which will provide for a nursing home in the future and will be subject to a separate planning application) / 0.2 km away / 15 September 2017Granted