Unit 10b, Galvone Industrial Estate, Co. Limerick.
Planning application 181278
DecisionConditional grant
Decided01 August 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Unit 10b, Galvone Industrial Estate, Co. Limerick.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 22838The continued retention of the capacity granted under P18/1278 i.e. to allow for the acceptance of not more than 24,500t per annum including additional waste streams collected under the normal operations of a waste management company along with all associated works / 0.0 km away / 28 February 2023Granted
- 211178Construction of a new extension(1103m2), new weighbridge office(11.5m2), raising the height of current building number one and part of the building number two by 1.5m, total roof area 1635m2to be raised, relocating the existing weighbridge onsite, new loading dock, new ESB substation and switch room(43.5m2), relocating and line marking of carparking spaces onsite, new bicycle racks and electrical charging points, new external security lighting, new screen planting at the rear of the building, minor changes of the existing north, west and south elevation of building one to include additional roller doors and fire escape doors, minor changes to the existing north elevation of building two to include additional fire escape doors, proposed new rainwater harvesting tank, firefighting water storage tank, oil interceptor and traffic bollards, the works to include all associated site services. The application is accompanied by a Environmental Impact Assessment Report(EIAR). The application relates to an existing waste facility permit WFP L 2021 12 001 01 R3 T1 / 0.1 km away / 13 October 2021Granted
- 18585The construction of a car park and yard extension, construction of a new boundary walls and fencing, alterations to existing entrance and gate, alterations to existing external cladding, erection of new signage, construction of truck loading dock and canopy and all ancillary site works / 0.1 km away / 14 September 2018Granted
- 17774Vehicular entrance and parking on driveway to include all ancillary works / 0.2 km away / 11 January 2018Granted
- 2315A single storey extension to the rear of the dwelling and retention permission sought for bay window with slate roof to the front of the dwelling / 0.2 km away / 28 March 2023Granted
- 17704An existing 17m high telecommunications structure carrying antennas, communications dishes together with associated ground-mounted equipment within a 2.4 metre palisade fenced compound as previously granted under Plan Ref No. 12/770063 / 0.2 km away / 07 September 2017Granted
- 2460073(a) Canopy to west elevation of building 1 (128m2), (b) External transformer, (c) Electrical switch room (6.9m2), (d) Fire Pump Housing to rear elevation (52m2), (e) External Fire Escape stairway to building 1A, (f) Additional gate for loading dock, (g) ESB substation, (h) Existing Extension to building 5 (170m2), (i) Relocation of the existing weighbridge, (j) Minor changes to the existing south elevation of building 3, (k) Air treatment system (35.8m2). And Full Planning Permission for: (l) Demolition of existing building 6 (506.3m2), (m) Construction of a new building 6 (1,313m2), (n) Proposed new roof to existing courtyard within building 3 and extension of the new roof to the rear elevation of building 3, (o) Relocation of the existing permitted 26no. carparking spaces onsite and associated line marking of carparking spaces, (p) Relocation of permitted bicycle racks, (q) Relocation of permitted 2 number electrical charging points, (r) New screen planting to the rear of building 6, (s) Proposed drop kerbs and traffic bollards, (t) Removal of existing front gate and fencing at building 6, (u) Installation of new external security lighting to building 6, and minor revisions to existing permitted security lighting within the overall site, (v) Installation of ducting for future electric charging points to proposed car parking spaces. The works to Include all associated site services, all in the townland of Galvone Industrial Estate, Roxboro, Limerick City, County Limerick, V94XC61. The application relates to an existing waste facility permit WFP L 2021 12 001 01 R4 T1 / 0.2 km away / 29 August 2024Granted
- 21138The phased alterations and change of use of Bay 1, some 2200 sq.m from Youth Resource/Social & Recreation Centre to warehousing. The works will include the following: Phase 1: Removal of the existing subdivision of Bays 2, 3, 4 & 5 of the former Fulflex Building to enable the current 4 units to be returned to their former combined arrangement. Erection of a covered conveyor line between VPK Packaging Ltd production building to the former Fulflex Building. Phase 2: Demolition of existing administration building along the front elevation of the former Fulflex Building to facilitate the increase of vehicular parking facilities to accommodate lorry parking bays and associated turning circle with associated site works. Removal of existing subdivisions between Bay 1 and adjoining bays to return existing arrangement to former combined format and a change in use from Youth Services Facility to warehousing. Phase 3: Demolition of existing single storey annex buildings along the eastern elevation of the VPK Packaging Ltd buildings and erection of a single storey industrial building extension in its place to accommodate replacement production equipment and associated site works including storm water attenuation tanks / 0.2 km away / 14 May 2021Granted