Killonan ESB, Townland of Milltown, Killonan Co. Limerick.
Planning application 18145
DecisionConditional grant
Decided11 April 2018
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Killonan ESB, Townland of Milltown, Killonan Co. Limerick.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 24344The development that will consist of: The installation of solar panels on 2 no. steel frames over each roof of 2 no. existing telecommunication cabins (covering an area of approx. 46 sq.m. and approx. 32 sq.m. respectively, each to a maximum height of 4.5 metres above ground level). Works to consist of all ancillary development works including steel uprights / 0.0 km away / 07 January 2025Granted
- 237011Extension of permission for planning ref 12/1002: an electrical transmission substation and associated infrastructure and works, within and adjacent to the site of the existing 220/110kV Killonan substation. The development consists of (1) construction of a 220kV Gas Insulated Switchgear (GIS) substation building, of 1,856m2 gross floor area, with a maximum height of approximately 14 metres above ground level, (2) construction of a 110kV GIS substation building of 1,642m2 gross floor area, with a maximum height of approximately 12.5 metres above ground level, (3) construction of associated and ancillary outdoor electrical equipment and other apparatus; construction of three lightning masts of approximately 18.4 metres in height; internal access road, car parking areas, boundary treatment, associated drainage and site development works, (4) associated transfer of circuits from the existing 220/110kV Air Insulated Switchgear (AIS) substation to the proposed GIS substation, (5) construction of six 110kV end masts to facilitate connection of the existing overhead line transmission circuits to the proposed substation equipment by way of underground cable connections. These end masts will replace six existing end masts which are located within the existing ESB Killonan site. Two of the six end masts will be located adjacent to, but outside the western and southern boundaries of the existing substation complex. One of these two end masts will be located in the townland of Coolyhenan, the other will be in the townland of Milltown. The remaining 4 end masts and all other proposed works are located within the existing ESB Killonan substation in the townland of Milltown. The proposed end masts will measure up to a maximum of 21.5metres in height and will be of a similar form, scale and character to those existing and (6) all associated site development works (this application is for a 10 year permission) / 0.1 km away / 21 June 2023Granted
- 191250Minor modifications to a previously permitted development (Ref. 12/1002). The proposed development comprises the extension of the existing Killonan 220/110 kV Electrical Substation compound by approx. 0.5ha along and adjacent to its existing western boundary. This will facilitate the proposed siting of a previously permitted Line Cable Interface Mast (LCIM) development includes the associated erection of 2.6m high palisade fencing along the extended western boundary of the substation compound and all associated and ancillary development at the existing Killonan 220/110 kV Electrical Substation / 0.2 km away / 18 February 2020Granted
- 18760Construction of dwelling, garage, modify an existing site entrance to create a dual combined entrance, install effluent treatment system including all associated site works / 0.6 km away / 04 January 2019Granted
- 20673The construction of an extension to an existing dwelling, new septic tank, percolation area and all associated site works / 0.7 km away / 08 September 2020Granted
- 18293(a) constructed existing ground floor residential unit, (b) constructed existing first floor residential unit, (c) constructed existing vehicular entrance. (d) Permission is sought to construct external access/escape stairs to residential unit first floor and replace existing septic tank and percolation area with new proprietary effluent treatment system to service both existing residential units / 0.7 km away / 17 December 2018Granted
- 20983Alterations and extensions to existing dwelling including all associated site development works / 0.8 km away / 04 March 2021Granted
- 22147Amendments to planning permission 20/983. The development will comprise carrying out part demolition of, and revised alterations and extension to existing dwelling including all associated site development works / 0.8 km away / 07 December 2022Granted