Croom Waste Water Treatment Plant, Croom, Co. Limerick.
Planning application 191201
DecisionConditional grant
Decided05 February 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Croom Waste Water Treatment Plant, Croom, Co. Limerick.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 19373An amendment to the design of the foul main drainage strategy associated with the works currently underway at the new post-primary school Colaiste Chiarain, previously granted permission under Planning Ref. no. 16/50. Permission is sought to change the foul sewer design strategy from the previous pumped solution as submitted under the foregoing planning reference to a gravity fall sewer, terminating at the existing Croom waste treatment facility and for all associated site works / 0.3 km away / 11 June 2019Granted
- 2460041The extensions and alterations to existing house, new garage, alterations to existing site entrance, new waste water treatment system with percolation area and all ancillary site works / 0.4 km away / 06 March 2024Granted
- 2560886The construction of an entrance lobby with balcony over and all ancillary site works / 0.5 km away / 28 October 2025Granted
- 2460312The construction of a new sports ground for Croom United Football Club which will consist of; one astroturf soccer pitch with lighting and two grass pitches, a single story clubhouse of gross floor area 177m2 containing dressing rooms and a gym, the widening of the existing vehicular site entrance, the provision of vehicle parking including accessible spaces and EV charging stations, bicycle parking, a refuse store, new foul and water mains connections, the provision of SuDS measures including attenuation tanks, swales, and a raingarden with all associated landscaping and associated site works / 0.5 km away / 30 July 2024Granted
- 211496Construction of an extension to the side and rear of the dwelling, replace existing flat roof at rear with a pitched roof with associated site works / 0.5 km away / 16 December 2021Granted
- 21630Demolition of an existing dwelling house and garage, construction of a residential development comprising 51 no. residential units(5 no. detached dwellings, 34 no. semi-detached houses, 12 no. terrace houses), accessed off the new Croom Distributor Road between the Old Cork Road and the Crecora Road with site entrances off said Distributor Road along with connection(s) to all water and utility services as provided by Limerick City and County Council as part of the new road construction and all ancillary site development works. Ancillary site development works include connection(s) to the public water main, foul and surface water drainage, access roads, footpaths, vehicle parking, landscaping, boundary treatments and site development works above and below ground / 0.6 km away / 08 April 2022Granted
- 2561385Extension to the existing dwelling together with all associated site works / 0.6 km away / 08 April 2026Granted
- 20525The construction of 14 dwelling houses, including 2 no semi-detached 2 bedroom bungalows, 12 no 2 storey semi-detached 3 bedroom houses, of which 4 will have an optional additional 4th bedroom on the ground floor and associated site development works, which includes 2 entrances to the public road, services, landscaping and the demolition of the side extension to the former community hall / 0.7 km away / 16 March 2021Granted