Avenue Row, Adare, Co. Limerick.
Planning application 19945
DecisionConditional grant
Decided12 November 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Avenue Row, Adare, Co. Limerick.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360957The construction of a dormer bungalow style dwelling. The works will include connections to existing services and all associated siteworks / 0.1 km away / 05 June 2024Granted
- 221199The demolition of the existing bathroom area and shed at the rear of the existing dwelling, the addition of a single storey extension to the rear of the existing dwelling, modifications to the existing dwelling and all ancillary site works / 0.1 km away / 10 January 2023Granted
- 2134A new two storey house on a vacant site with a glazed covered patio to one side, 4 no. bedrooms, a repositioned site entrance and all associated site works / 0.1 km away / 18 May 2021Granted
- 237The modification to two story dwelling house previously granted permission reference LCCC 2134, ABP-310474-21. The proposed modifications include changes to (i) internal layout, (i) external walls, (iii) roof profile. Provision of a new front porch and all ancillary site works including, drainage and utility infrastructure / 0.1 km away / 13 April 2023Granted
- 20502Demolition of existing kitchen & bathroom at rear of house, construction of new ground floor extension at rear of house incl. kitchen-dining-family room and WC, internal courtyard, first floor extension at rear of house including new bedroom, bathroom, new external balcony incl. balustrade and fixed side screen, internal modifications and associated site works / 0.1 km away / 06 November 2020Granted
- 19521Construction of an extension to the rear of the existing dwelling and all associated site works / 0.1 km away / 24 October 2019Granted
- 2460753The demolition of the existing wc, kitchen and store and the part demolition of the existing hall, all to the rear of the existing house. Permission is also sought for the construction of a single-storey extension to the rear and all associated site works. All above works to be carried out at at No. 4, The Back Avenue, Adare which is a protected structure RPS No. 1684 and on the NIAH [National Inventory of Architectural Heritage] Schedule, Ref No. 21824017 / 0.1 km away / 06 November 2024Granted
- 2561395The construction of an extension to the house at The Elms, Rathkeale Road, Adare, Co. Limerick, which is a protected structure. The development will include a single-storey extension incorporating an open-plan kitchen/dining area, linked to further kitchen space in adjacent internal spaces. Alterations to the existing building to include the creation of a new window on the rear elevation from the living room, removal of windows and doors to facilitate the replanning of the new kitchen and subdivision of the existing kitchen into a new utility room and WC. Works to also include all ancillary drainage, site works and external landscaping / 0.1 km away / 25 February 2026Granted