Kilmihil, Ballingarry, Co. Limerick
Planning application 201234
DecisionRefused
Decided27 January 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Kilmihil, Ballingarry, Co. Limerick?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 25192The construction of a domestic garage and all associated site works / 1.8 km away / 02 October 2025Refused
- 217038Extension of duration for 16/573 for the construction of a detached dwelling house, new entrance, driveway, mechanically aerated treatment unit with stratified sand polishing filter and all associates siteworks / 2.9 km away / 02 December 2021Refused
- 191029A change of use from a domestic garage to a pre-school and increase number permitted under previous planning ref. 16/779 from 11 up to 22 children, replace window with a double door to front of pre-school, hardcore yard car park spaces and Permission to upgrade waste water treatment and disposal system and all associated works / 3.0 km away / 11 December 2019Refused
- 211133Construction of a new dwelling house, detached garage, site entrance, waste water treatment system, percolation area and all associated site works / 4.5 km away / 30 September 2021Refused
- 2560193The construction of a single storey house, detached garage, entrance, on site waste water treatment system, percolation area and all ancillary works / 4.7 km away / 31 July 2025Refused
- 23413The construction of a new dwelling house, detached domestic garage, wastewater treatment unit and polishing filter, entrance, bored well and all associated site works / 5.6 km away / 24 October 2023Refused
- 2560692Construction a poultry house, concrete aprons, feed silos, clean and soiled water storage tanks and carry out all associated ancillary site works / 5.8 km away / 06 March 2026Refused
- 2560239The construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured), and a bio-based fertiliser from organic material. The total proposed gross floor area of the development (including internal plant areas and ancillary structures) will be c. 5,903 sq.m. The development will consist of the following: • Construction of 2 no. primary digesters (with an overall height of c. 9.1m), a pump house (with a gross floor area (GFA) of c. 279.8 sq.m), and 2 no. post digester tanks (with an overall height of c. 9.1m), located in the northeastern section of the site. • Construction of 2 no. prepits (c. 4.8m in height), a pasteurisation buffer tank (c. 4.8m in height), and a pasteurisation unit (with a maximum height of c. 4.2m), located west of the primary digesters, within the northern section of the site. • Construction of a digestate storage tank (c. 11.3 in height) located centrally on site, to the south of the primary and post digester tanks. • Construction of a digestate treatment building and a feedstock reception building (with a height of c. 12m and a GFA of c. 2,797.2 sq.m) with odour abatement system (with a height of c. 11m to odour abatement stack), located in the northwestern section of site. • Construction of combined heat and power (CHP) unit (c. 2.6m in height and c. 5.6m in height to flue, with a GFA of c. 38.53 sq.m), a biogas boiler (c. 2.6m in height and c. 5.6m in height to flue, with a GFA of c. 12.74 sq.m), a backup boiler (c. 2.6m in height), a gas treatment system (c. 4.2m in height), a biomethane compression system (c. 4.2m in height), and a safety flare (c. 11.3m in height), located south of the digestate storage tank, in the south-east section of the site. • Construction of a CO2 liquefactor (with an overall height of c. 10.7m to top of storage vessels), a propane tank compound accommodating 2 no. propane tanks (c. 1.6m in height), and an ESB substation (with a GFA of c. 23.5 sq.m and a height of c. 3.4m), located in the south-eastern section of the site. • Construction of roofed silage clamps (with a GFA of c. 2,424 sq.m and a height of c. 8.7m) and a fuel storage tank (c. 2m in height), located in the western section of the site. • Construction of a two storey office building (with a GFA of c. 327.4 sq.m and a height of c. 11m) within the western section of the site, adjacent to the site entrance. • Alterations to the adjacent local road including a new site entrance and access arrange / 6.6 km away / 14 May 2025Refused