Knockbweeheen, Ardagh, Co. Limerick.
Planning application 201309
DecisionRefused
Decided10 February 2021
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Knockbweeheen, Ardagh, Co. Limerick.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2350The change of use from a precast concrete manufacturing plant and open storage area to use solely as an area for the storage of timber products used in construction, along with the reinstatement of an unauthorised open storage area to its original use(agricultural). Retention permission for the current access to the area from the public roadway and an existing building used in the manufacture of concrete products. Permission for alterations to the current access and a change in use of the existing building to the storage of timber products / 0.1 km away / 22 March 2023Refused
- 2138Domestic garage as built from that granted under planning ref. 19/154, the use of the garage as a temporary living accommodation for 5 years and permission then to revert back to a garage building, permission for the ground floor extension of existing dwelling house and to construct a retaining wall along existing driveway and garage, and all associated works / 0.8 km away / 09 March 2021Refused
- 22395The construction of two single dwellings, with garages, entrances, wastewater treatment systems, percolation areas and all ancillary site(s) works / 1.8 km away / 01 June 2022Refused
- 257039Extension of Duration for Planning Ref. 20/1082: the relocation of the existing site entrance and all associated site works / 1.9 km away / 10 February 2026Refused
- 257012Extension of Duration for Planning Ref. 20/535: demolition of existing dwelling house and garage, construction of a replacement dwelling house, entrance, wastewater treatment unit, polishing filter and all ancillary site works / 1.9 km away / 23 July 2025Refused
- 2561367Six (6) wind turbines with a tip height of 158m, a rotor diameter of 136m and all associated foundations and hardstanding areas. A 38kV on-site substation compound containing a substation building, associated electrical equipment and transformers with separate client side and ESB entrances. The building will contain a control room, switchgear room, ESB room and store room, underground electrical and communications cabling between the wind turbines and on-site substation. Grid Connection Option A: 2.54km-long 38kV underground cable connection from the on-site substation to the existing Carrons substation to the west of the site. Grid Connection Option B: Loop into the existing 38kV onsite overhead line via the proposed 38kV substation. A new temporary site entrance off the L1219 local road to the west of the permanent site entrance for the construction phase only. Upgrade of an existing farm entrance and access track off the L1219 local road in the northwest of the site to serve as a permanent site entrance for the wind farm when operational. Approximately 3.4km of new site access tracks with associated turning areas and drainage. This includes approximately 490m of temporary access tracks which will be reinstated following construction. Upgrade of approximately 470m of existing site access tracks. A 9m-long clear span bridge crossing of the Ahacronane River by an internal site access track to the northwest of turbine T1 and an associated 1.5m x 1.0m relief culvert. A permanent meteorological mast with a height of 90m, a foundation and hardstand. Two (2) material storage areas with a total capacity of approximately 39,300m3. A temporary construction compound with an area of approximately 1,375m2. All associated site development works, including drainage, diversion or undergrounding of low voltage powerlines, landscaping and revegetation. This planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) which have been prepared in respect of the construction, operation and decommissioning of the proposed development, and works to facilitate turbine delivery from the port of Foynes to the wind farm site entrance via L6188, N69, L1222, L1220 and L1219. The Applicant is seeking a 10-year planning permission and 35-year operational life, initiating from the date of full commissioning of the entire wind farm. This development is covered by the provisions of the Renewable Energy Directive III (Di / 3.4 km away / 27 March 2026Refused
- 17898The construction of a new dwelling house served by a wastewater treatment system and polishing filter, new vehicular entrance and all ancillary site works / 3.5 km away / 25 January 2018Refused
- 2460527A change of use of a portion of the existing light industrial building to 9 no. residential apartment units and associated site works. The development will consist of changes to elevations to accommodate new external windows and doors and internal alterations to construct 3 no. 1 bed apartments at first floor level and 1 no. 2 bed apartment and 5 no. 1 bedroom apartments at ground floor level and all associated site works / 3.7 km away / 23 July 2024Refused