Aughinish Alumina Limited, Aughinish Island, Askeaton Co. Limerick
Planning application 21312146
DecisionConditional grant
Decided31 August 2022
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Aughinish Alumina Limited, Aughinish Island, Askeaton Co. Limerick?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 181236The demolition of the existing three span bridge and construction of a new single span bridge consisting of piled abutments and a stell truss superstructure to facilitate the potential future re-introduction of freight traffic on the Limerick to Foynes railway line at Churchfield/Island MacTeige. The existing intermediate piers will remain in place in a non load bearing capacity. The works also includes the temporary relocation of a salt marsh during the construction of the bridge structure. A Natura Impact Statement has been prepared for the development / 0.9 km away / 06 June 2019Granted
- 17714A ten year permission for development on this site of c. 7 hectares located adjoining the existing Aughinish Alumina Ltd plant for the provision of a Borrow Pit with an extraction area of c. 4.5 hectares to extract c. 374.000 m³ of rock over a 10 year period. The extraction area is sought up to a maximum depth of c. 8.5 m O.D., with extraction to occur between April and September each year. The proposed development includes the demolition of a contractors shed and all ancillary site development, areas of stockpiling, landscaping and boundary treatment works above and below ground, including restoration of the extraction area. Aughinish Alumina Limited carries out an activity requiring an Industrial Pollution Prevention and Control Licence (now replaced by an Industrial Emissions Licence – Licence Register No. P0035-06). The development and operation of the proposed Borrow Pit is not a licensable activity. An Environmental Impact Statement (EIS) will be submitted to the Planning Authority with the application. / 1.0 km away / 31 January 2018Granted
- 201325The provision of nature trail and upgrade of existing nature trail, construction of a car park comprising 29 no. car parking spaces, new vehicular access and associated landscaping and boundary treatment works. It is also sought to demolish existing derelict structures and a bird hide and construct a new bird hide in its place. A Natura Impact Statement(NIS) will be submitted to the planning authority with the application / 1.3 km away / 18 May 2021Granted
- 211500Construction of extension to existing bulk storage units and all associates site works / 1.3 km away / 21 December 2021Granted
- 2360011Construction of three covered industrial type warehouse units with associated external storage, parking and circulation areas, Upgrade of existing site services and all ancillary works associated with the site development, The application is for a 10 year permission and will include the submission of an Natura Impact Statement (NIS) to the Planning Authority / 1.3 km away / 19 September 2023Granted
- 19853The construction of a single storey industrial packaging shed with conveyors supply mechanism, rectangular roller tray outfeed and all ancillary site works / 1.4 km away / 13 December 2019Granted
- 2660220Construction of a workshop at our existing facility including all associated site works. Works shall also include the dismantling/demolition of an existing store on the site / 1.4 km away / 23 April 2026Granted
- 22396The construction of a 950m2 solar panel array with an export capacity of approximately 250KWh to be mounted on the roof of existing Bulk Store Warehouse to include ancillary works associated with the development / 1.4 km away / 31 May 2022Granted