Bloodmill Road, and Oakwood Singland, Limerick
Planning application 23605
DecisionConditional grant
Decided07 August 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Bloodmill Road, and Oakwood Singland, Limerick?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 252201 no. two storey 3 bedroom detached dwelling house with off street car parking, connection to main sewer and associated site works / 0.0 km away / 25 February 2026Granted
- 2560151A residential development comprising 31no. residential units, (1no. detached house, 6no. semi-detached houses, 14no. terrace houses, 10no. duplex units in a 3 storey block), construction of all associated roads, site entrance, boundary treatments, footpaths, car parking, street lighting, demolition of an existing dwelling and sheds, and all ancillary site development works / 0.1 km away / 23 October 2025Granted
- 21823Removal of existing porch and construction of a new porch and bay window extension to the front of dwelling with lean-to roof over and removal of existing domestic store at the side of the dwelling and construction of an extension at the side and rear of dwelling and all associated site works / 0.2 km away / 03 August 2021Granted
- 18529The construction of an extension to existing dwelling house, modifications to existing dwelling house and all ancillary site works / 0.2 km away / 19 July 2018Granted
- 25118Raising the existing end gable wall and hip roof to facilitate an attic conversion (storage only) and all ancillary site works / 0.2 km away / 04 June 2025Granted
- 17452For the construction of an extension to existing dwelling house and all ancillary site works and permission for retention for the construction of a garage and the height of the front boundary wall / 0.2 km away / 05 July 2017Granted
- 17884A take away which was previously granted planning permission under planning ref no. 12/770113 / 0.2 km away / 10 November 2017Granted
- 2560488The change of use of the 958.5 sq.m gross floorspace vacant two storey over basement building from pub/restaurant use a community resource hub to be operated by MS Ireland. The proposal will comprise of: At basement - 3 no. meeting rooms with ancillary office; Staff canteen; Staff changing area; Ancillary areas – circulation, WC, showers, storage, etc. At ground floor: Flexible studio; Gym; Reception / lounge area with kitchenette; Meeting room; Admin office; 1 no. treatment room with office; Ancillary areas – circulation, WC, showers, storage, etc. At first floor: Open plan office; Ancillary areas – circulation, WC, showers, storage, etc. Externally: Soft landscaping to north; Bicycle shelter with sheltered and secure parking for 10 no. bicycles; Refuse storage area with capacity for 3 no. 1,100 litre bins, to allow for recycling and waste segregation; 1 no. MS Ireland signage at first floor level, backlit, to north elevation; 1 no. MS Ireland signage at first floor level, backlit, to east elevation; 1 no. backlit signage panel adjacent to main entrance door at ground floor level; replacement of existing timber cladding with timber effect composite or similar. The proposed development includes all associated and ancillary works, including internal fit-out works and new AOVs to roof. / 0.2 km away / 18 July 2025Granted