Coast Road, Caheragh, Glin Co. Limerick.
Planning application 25148
DecisionConditional grant
Decided01 July 2025
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Limerick County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Limerick has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Coast Road, Caheragh, Glin Co. Limerick.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560828A 10 year permission for (1) the construction of a wastewater treatment plant at Caheragh, Glin, including rising mains discharge chamber, inlet works with screen, flow distribution chamber with flow monitoring, 2 no. primary settlement tanks with splitter chamber, sludge pumping station and sludge holding tank, storm storage tank, tidal tank, control building, surface water drainage network including swale linking to existing drains, site lighting (both task lighting and road lighting), boundary fencing, landscaping and biodiversity enhancements, solar panels on block mounted frames, and entrance scheme signage. Access to the wastewater treatment plant to be provided via a proposed new entrance onto the public road network to the south (L-6106), below ground interconnecting pipework; (2) the construction of a wastewater terminal pumping station (TPS) including: underground storm storage tank, pump sump chamber, flow meter chamber, overflow chamber with screen, 2 no. valve chambers, bauer connection chamber, wet and control kiosks, vent stack, landscaping to include redesign of Town Park public amenity area, removable bollards, the temporary removal and re-instatement of a portion of the wall, and all ancillary site development works at Ballygiltenan North, Glin; (3) Foul water rising main between the wastewater treatment plant site and terminal pumping station comprising the laying of pipework on private land and within the Coast Road (N69), including along N69 bridge crossing the Glencorbry River; (4) Gravity storm overflow pipeline from terminal pump station to a new outfall in the maritime area comprising the laying of pipework within the town park and Coast Road (N69) including a rodding and scour chamber;(5) the construction of a new effluent outfall gravity pipeline from wastewater treatment plant site to a new outfall in the maritime area comprising the laying of pipework on private land and within the Coast Road (N69), including along N69 bridge crossing the Glencorbry River; (6) partial demolition/decommissioning of the existing tidal tanks and decommissioning of the existing outfall pipeline assets landwards of the High Water Mark (HWM) within the Town Park public amenity area; (7) Proposed upgrades to underground foul sewer network at the junction of Mary Street and Coast Road (N69) comprising the laying of new sewer pipework to the terminal pumping station and; (8) all associated site development and site excavation works above and below groun / 0.2 km away / 27 January 2026Granted
- 2660518Construction of a new dwelling house, domestic detached garage, entrance, driveway, packaged wastewater treatment system with percolation area and all ancillary site works / 0.4 km away / 01 July 2026Granted
- 18185Construction of a new dwellinghouse and detached domestic garage with associated wastewater treatment system, percolation area, sharing parents existing site entrance and related site works / 0.4 km away / 25 April 2018Granted
- 24610951) removal of existing single-storey metal storage shed from site; 2) removal of existing manual car washing facilities from site; 3) removal of solid fuel storage area; 4) relocation on site of existing bin storage area and of 1 no. diesel dispenser; 4) construction of new proposed single-storey extension to side of existing amenity building to accommodate back-of-house areas; 5) internal alterations to the existing amenity building to include planning permission for change of use of part of existing ground floor shop from retail use to new off-licence use (sale of alcohol for consumption off the premises to be ancillary to the existing primary retail use and located in within the convenience shop floor area); 6) minor elevational changes to the exiting elevations of amenity building; 7) all associated site development works / 0.4 km away / 02 July 2025Granted
- 171000The construction of a new dwelling house and detached domestic garage with associated wastewater treatment system, percolation area, sharing parents existing site entrance and related site works / 0.5 km away / 21 December 2017Granted
- 22905The decommissioning of existing septic tank and soak pit. Installation of new packaged waste water treatment system with eco-flo filter and all ancillary site works / 0.5 km away / 06 October 2022Granted
- 19944(a) demolish existing rear extension to existing cottage, (b) construct new rear extension and renovate existing cottage with existing connection to public utility services with all associated site works / 0.6 km away / 12 November 2019Granted
- 2360045The Construction of 3 no. two storey terraced dwelling houses including connection to existing combined sewer and existing watermian on public road and all associated site works / 0.6 km away / 29 June 2023Granted