Ferefad, Longford, Co. Longford.
Planning application 17258
DecisionConditional grant
Decided06 December 2017
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Longford County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Longford has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ferefad, Longford, Co. Longford.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360080Proposed single storey extension to the side of existing dwelling and detached garage/store to the rear and all ancillary site works / 0.3 km away / 17 August 2023Granted
- 208Retention and completion of alterations to elevations and roofline of dwelling approved under permission 15/214 at Knockahaw, Longford. The alterations will include extending the front bay windows into the first floor elevations and adjustments to the approved roofline / 0.5 km away / 10 March 2020Granted
- 17272For (1) construction of a 3 bay extension to the southern end and a 2 bay extension to the northern end of existing building for wood processing, and (2) all ancillary site services / 0.5 km away / 01 December 2017Granted
- 22134To erect 1039.00 m2 or 184.20 kWp of photovoltaic panels on the roof of our existing buildings, in our factory with all associated site works / 0.5 km away / 21 July 2022Granted
- 1980For (1) construction of a new 2,421m2 building for storage, (2) construction of a new refuelling building, (3) demolition of the existing refuelling & hacksaw buildings and (4) all ancillary site works / 0.6 km away / 08 May 2019Granted
- 2460167(1) construction of a new timber cladded welfare building containing lunch room, locker rooms and toilet facilities, (2) new proprietary effluent treatment system and percolation area, and (3) all ancillary site services / 0.6 km away / 17 September 2024Granted
- 2360016(1) construction of a new metal cladded building for light manufacturing and storage, and (2) all ancillary site services / 0.6 km away / 12 June 2023Granted
- 2560104A protected structure ref 368. The development will consist of: Amendments to Planning Approval reference: 23/60217 which includes: Addition of plant enclosure to the South Elevation next to the Duplex Annex. Adjustment to extent of Terraces to Duplex Annex South Elevation. Addition of glass clad metal and timber framed Canopy to the exterior of the Bar and Hotel Lobby. Slight increase in extent of Ensuite extension adjacent to Manor House. Rooflight added to Hotel Lobby. Extent of flat roof adjusted to suit Construction detailing/revised extent of En-Suite extension. Detailing revised to lantern roof above New Lobby. Facade rearranged to suit internal rearrangements to level 01 extension beside Manor House. Balustrade added. Access Doors to Annex rooms adjusted to work within existing openings. External feature timber structure to New Lobby rearranged. Castellations rearranged to Storehouse/apartment building. Window openings enlarged to Storehouse/apartment building. Garage door revised to window openings to the Storehouse/apartment building. Facade finish to the Storehouse/apartment building changed from blockwork to Pebbledash/Harling on the South Elevation and East Elevation. Window openings added to the Ground floor South Elevation to the Storehouse/apartment building. Storehouse/apartment building hipped roof revised to pitched roof with Gable. Zinc added to Gable. Ground floor of the Storehouse/apartment building changed from storage to apartment / 0.7 km away / 08 August 2025Granted