Aughamore, Lanesborough, Co Longford
Planning application 19158
DecisionConditional grant
Decided31 July 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Longford County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Longford has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Aughamore, Lanesborough, Co Longford?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460008The retention and completion of existing partially constructed single storey apartment type building consisting of 2 no. one bedroom studio type apartments, provision of onsite car parking, proposed connections to existing services and all ancillary site works / 0.1 km away / 03 December 2024Granted
- 2360124The proposed development will comprise: • the replacement (“restringing”) of the existing overhead line circuit conductor wires with a new higher capacity conductor including installation of a new fibre communication connection; • the replacement of 52no. existing polesets and 4no. towers - any replacement structures will be constructed at, or immediately adjacent to the existing structures they will replace, will be along the same alignment as existing; • the replacement of angle mast AM3A with a poleset; • the retention and refurbishment, steel member replacement, painting and foundation strengthening of the one retained end mast EM1; • the replacement of hardware and fittings at all structure locations; • the replacement of stay arrangements at 27no. locations; • the replacement of crossarms at 27no. locations; • the installation of insulators at 13no. locations; • the replacement of vibration dampers at 12no. locations; • the reinstallation of all anti-climbing guards; • the reinstallation of aircraft warning spheres at span 127-128; • all associated works within the existing Lanesboro 110 kV substation to accommodate the uprated 110 kV OHL including uprating of the Mullingar bay in Lanesboro 110 kV substation, routing of fibre optic cable from end mast into substation and alterations to existing hardware; • all associated temporary site development works to gain access to the existing structures including clearance of vegetation, disassembly and reassembly of gate posts / piers and removal and reinstatement of existing fencing; and • other temporary associated and ancillary site development works required for the purpose of the uprate of the existing circuit, including construction compounds, silt traps, silt fences, stone tracks, ground protection mats, infrastructure crossing support systems and temporary watercourse crossings / 0.1 km away / 17 October 2023Granted
- 2612Change of use of a Residential Dwelling House to Commercial use, namely new kitchen and refrigeration storage at ground floor level and storage use at first floor level and all associated works / 0.1 km away / 23 March 2026Granted
- 174(A) proposed change of use of existing building previously used as an oratory into a restaurant to service existing bed & breakfast accommodation known as Convent Guest House, (B) The proposed construction of a kitchen/service area to service the above mentioned proposed restaurant, (C) proposed construction of a new door ope to the south western elevation of proposed restaurant, (D) proposed erection of signage to the south western elevation of proposed restaurant, (E) proposed erection of two number signs located inside the front boundary wall and all ancillary site works / 0.2 km away / 28 February 2017Granted
- 2360108The proposed development within Co. Longford will comprise: • the replacement (“restringing”) of the existing overhead line circuit conductor wires with a new higher capacity conductor including installation of a new fibre communication connection; • the retention and refurbishment, steel member replacement, painting and foundation strengthening of the one retained end mast EM1, including the replacement of hardware and fittings, replacement of vibration dampers, and replacement of insulators at EM1; • The cutting of timber / vegetation; • all associated works within the existing Lanesboro 110kV substation to accommodate the uprated 110kV OHL including uprating of the Sliabh Bawn bay in Lanesboro 110kV substation and alterations to existing hardware; and • other temporary associated and ancillary site development works required for the purpose of the uprate of the existing circuit, including construction compounds, silt traps, silt fences, stone tracks, ground protection mats, infrastructure crossing support systems and temporary watercourse crossings / 0.2 km away / 25 September 2023Granted
- 23600561. Construction of a Gas Insulated Switchgear (GIS) compound measuring approximately 92.8m by 90.5m. The proposed GIS compound will be raised to a ground level of 1.2m higher than the existing ground level at the site, and will comprise: (i) GIS building with an approximate gross floor space 1624.1m2 and height of 15m (in addition, 6 no. lightning protection rods, approximately 3m in height, are located on the parapet of the GIS building); (ii) An internal access track measuring approximately 245m in length and 5m in width, 15 no. car parking spaces; underground stormwater attenuation tank; underground foul wastewater pumping station and all associated site development and landscaping works; and (iii) The substation compound will be bounded by a palisade fence 2.6m in height and further enclosed by a property fence measuring 1.4m in height. 2. The proposed development will also consist of the redevelopment of the existing AIS 110 kV substation, comprising the following: (i) Decommissioning of the 110 kV AIS busbar and 110 kV primary plant within the existing 110 kV AIS substation; (ii)The modification of 8 no. existing 110 kV underground circuits which will be re-routed into the new 110 kV GIS substation; and, (iii) Construction of 3no. underground joint bays; 1 no. new gantry tower (approximate footprint of 30.2m2 and a height of 12.5m); 1 no. new Line Cable Interface Mast (approximate footprint of 123m2 and a height of 20.7m); removal of the existing 110 kV OHL tower and section of cable which extends to the proposed Line Cable Interface Mast and all associated and ancillary transmission infrastructure. 3. Construction of a Distribution System Operator (DSO) compound measuring approximately 30m2; 4. Construction of a landowner access road (hardcore surfacing) of approximately 91m in length and 6m in width; and, 5. All ancillary site development works to facilitate the proposed development including geotechnical and geo-environmental ground investigations, site preparation works, site clearance and levelling, site drainage and associated outfall headwall to facilitate discharge to the River Shannon, temporary construction compounds and landscaping / 0.2 km away / 11 August 2023Granted
- 1786The proposed change of use of existing oratory into a restaurant to service both the general public and also to service the patrons of the existing bed & breakfast accommodation known as The Convent Guest House and all ancillary site works / 0.2 km away / 08 May 2017Granted
- 19201The development will consist of the redevelopment of the existing Lanesboro 110kV AIS substation with a new 110 kV Gas Insulated Switchgear (GIS) substation. The 110 kV GIS substation redevelopment will comprise of the following elements: (i) A110 kV GIS substation contained within a building with a gross floor area of approximately 1,470m2 (54m x 15m) and a height of 15m. Associated development within the footprint of the GIS substation development will include: 6 no. lightning rods of approximately 3m in height located on the parapet of the GIS Building: a Distribution System Operator (DSO) compound (approximately 30m2); an internal circulation road of approximately 245m in length and 5m in width, 12 no. car parking spaces; underground stormwater attenuation tank; underground foul wastewater pumping station and all associated site development and landscaping works. The substation will be bounded by a palisade fence 2.6m in height and bounded with a property fence 1.4m in height; (ii) The modification of 8 no. existing 110 kV underground circuits which will be re-routed into the new 110 kV GIS substation: Sliabh Bawn-Lanesboro underground circuit, Cloon-Lanesboro underground circuit, Athlone-Lanesboro underground circuit, Richmond 1-Lanesboro underground circuit, Richmond 2-Lanesboro underground circuit, Lough Ree Power T104-Lanesboro underground circuit, T141-Lanesboro underground circuit and Mullingar-Lanesboro underground circuit. Associated development includes the construction of 3 no. underground joint bays; 1 no. gantry tower (footpring of 30.2m2 and a height of 12.5m); 1 no. Line Cable Interface Mast (footprint of 123m2 and the height of 20.7m) and all associated and ancillary transmission infrastructure. (iii) The construction of a Landowner access road of approximately 91m in lenghth and 6m in width / 0.2 km away / 20 May 2020Granted