Derraghan Beg, Ballymahon, Co Longford
Planning application 21173
DecisionConditional grant
Decided19 August 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Longford County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Longford has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Derraghan Beg, Ballymahon, Co Longford?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560041Proposed slatted shed and all ancillary site works / 0.1 km away / 25 April 2025Granted
- 2360013A single storey extension to the rear of existing bungalow with all associated internal and elevational changes and all associated site works / 0.5 km away / 12 June 2023Granted
- 17320An increase in the capacity of the operational Ash Disposal Facility to allow for the deposition of 130,000 tonnes of dry ash over and above the 550,000 tonnes permitted under Longford County Council Reg. Ref. 01/115; An Bord Pleanala Reg. Ref. PL14.125540. The ash will be disposed of within engineered cells, constructed under the existing permission, and the facility will utilise permitted site services including the existing site entrance from the R392 and other site infrastructure. The facility will exclusively accept ash from Lough Ree Power Station in Lanesborough (Lanesboro) and will operate until 31st December 2020. This planning application will be accompanied by an EIA Report (previously known as an EIS). Lough Ree Power Station and the associated Ash Disposal Facility, are licenced by the EPA under an Industrial Emissions (IE) Licence [Ref. P061002]. / 0.9 km away / 22 February 2018Granted
- 22225An integrated constructed wetland (ICW) over a total area of 5.58 ha located within the existing LRP ADF site, including formation of wetland cells, associated works and access roads using onsite soils. The development will include landscaping both within the wetland cells and surrounding area. The purpose of the ICW is for the management and treatment of leachate arising from the ADF, which is planned as part of their closure, restoration and aftercare management plan. Any discharge waters following treatment through the ICW will flow to two open water cells for containment. LRP station and the ADF are licenced by the Environmental Protection Agency under an Industrial Emissions (IE) licence (Ref. P0610-03). A Natura impact statement (NIS) has been prepared for the purposes of this project. / 1.0 km away / 10 November 2022Granted
- 22284Proposed construction of 2 no. detached kennelling structures both of which incorporate 20 no. kennels, 2 no. treatment rooms, laundry room, kitchen & 2 no. storage rooms in each structure, proposed connections to existing services and all ancillary site works / 1.2 km away / 07 February 2023Granted
- 22217The proposed erection of a covered animal exercise enclosure structure and all ancillary site works / 1.2 km away / 25 October 2022Granted
- 21211Completion of domestic garage and all associated works / 1.3 km away / 27 August 2021Granted
- 2237To retain an existing domestic garage as constructed, along with all other associated site works / 1.3 km away / 08 April 2022Granted