Rathmore, Aughnacliffe, Co Longford
Planning application 2189
DecisionConditional grant
Decided19 May 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Longford County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Longford has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Rathmore, Aughnacliffe, Co Longford?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 22280To retain a single storey bedroom extension and entrance hall built (circa 2000) with a total floor area of (26.9m2) to the rear of an existing two storey dwelling house, two storey granny annex extension to the side of the existing dwelling house built (circa 1992) with a total floor area of (67.2m2). Full planning permission to construct a two storey extension to the side of the existing granny annex with a floor area of (151.3m2) and all ancillary site works / 0.4 km away / 02 February 2023Granted
- 2260The proposed demolition of an existing two storey dwelling house with out houses, decommissioning of existing septic tank with soakpit together with the proposed construction of a bungalow type dwelling house, detached garage, entrance, boundary fence/wall, onsite suitable treatment system with polishing filter and all ancillary site works / 0.6 km away / 03 May 2022Granted
- 21288Construct a two storey dwelling house with single storey elements, detached domestic garage, new entrance, boundary walls, piers and fencing, proprietary wastewater treatment unit and percolation area and all ancillary site works / 0.7 km away / 21 January 2022Granted
- 18265To construct a single storey dwelling house and detached domestic garage, new entrance, boundary walls, piers and fencing, proprietary wastewater treatment unit and percolation area and all ancillary site works / 0.7 km away / 14 January 2019Granted
- 2360033Proposed construction of a residential development of 3 no. dwelling houses comprising of 2 no. two bedroom single storey semi-detached type dwelling houses, 1 no. two bedroom single storey detached type dwelling house, proposed erection of boundary fences/walls, proposed vehicular access from the adjoining residential estate known as “The Dolmens”, proposed pedestrian access from the adjoining public road, proposed connections to the existing foul sewer, surface water and watermain networks servicing the village of Aughnacliffe and all ancillary site works / 0.9 km away / 30 January 2024Granted
- 21139Of 2 No. single storey dwelling houses as constructed and all ancillary works / 1.0 km away / 30 July 2021Granted
- 22200To construct a self contained apartment unit over an existing pub, and alterations to an existing storage shed, and all ancillary site works / 1.0 km away / 06 October 2022Granted
- 1987Proposed construction and completion of existing residential development previously granted planning under 04/1061 & 05/302 where it is proposed to construct 30 no. dwelling houses consisting of a) 12 No. two storey semi-detached 3 bedroom dwellings, b) 15 no. single storey semi-detached and terrace type 2 bedroom dwellings, c) 3 no. terrace type two storey 3 bedroom dwellings, d) provision of access from existing service roadway, e) green open space, boundary fences/walls, internal access road, f) connection to existing public services with sewer and water supply and all associated ancillary site works / 1.0 km away / 10 December 2019Granted