St Joseph's National School, Dublin Road, Longford
Planning application 22300
DecisionConditional grant
Decided05 September 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Longford County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Longford has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near St Joseph's National School, Dublin Road, Longford?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2660080Repair & insulation works to roof, repair of rainwater goods and all ancillary works, a PROTECTED STRUCTURE ref. 452 / 0.1 km away / 27 April 2026Granted
- 2460145Alterations to existing protected structures (ref. 460 & 461 & 462 & 463) as follows: change of use of ground floor no. 1 and no. 2 from office to guest accommodation; internally rearrangement for no.1 and no.2 and all ancillary works; provision of enclosed amenity building to rear (45.00 sqm) / 0.1 km away / 27 August 2024Granted
- 18237Alterations to existing protected structures, No. 1, 2, 3 & 4 Keon's Terrace, Dublin Road, Longford as follows: change of use of ground floor office to no. 3 and ground, first and second floor office to no. 4, including residential unit to rear no. 4, as single residential unit; minor changes internally and to rear externally, and all ancillary works / 0.1 km away / 28 November 2018Granted
- 20310Retention is sought to West of Main School for change of use from industrial/commercial to educational use; internal alterations over 2 floors (total floor area 716.9sqm) and minor alterations to side and rear elevation (facing Convent Road) and ancillary works at former Turners Print Works site, Convent Road & Earl Street. Permission is also sought to extend duration of temporary permission, granted ref 11700021 (ABP ref PL68.239942), for first floor 2 classroom extension for further ten year period at North side of main school building at Mean Scoil Mhuire, Convent Road on behalf of Board of Management at Mean Scoil Mhuire (a protected structure) / 0.1 km away / 12 February 2021Granted
- 2660017Works to a PROTECTED STRUCTURE ref. 517 as follows: retention of roof repairs; demolition of garage to east & toilet block to south; new extension to east and south, alteration and upgrade of existing dwelling and all associated internal and external works / 0.2 km away / 25 June 2026Granted
- 2360122Demolition of the existing single storey extension to the rear and proposed 2-storey extension to the rear of the existing dwelling and all associated ancillary site works and services / 0.2 km away / 17 October 2023Granted
- 23651. proposed demolition of a single storey extension to the rear of existing two storey terrace type dwelling house. 2. proposed construction of a two story extension to the rear of existing two storey terrace type dwelling house and all ancillary works / 0.2 km away / 11 May 2023Granted
- 2360232The addition of a mobility impaired access structure (MIAS) that will be within the curtilage of Protected Structures (RPS Reference Nos.: 454, 476, 481, 482, 483, 484, 485 and 487, NIAH Survey Data Reg Nos.: 13004129, 13004044, 13004150, 13004046, 13008005, 13008006, 13008008 and 13004152). The structure is a hybrid assembly of different concrete and steel elements including a pair of staircases (two flights each), free standing lift shafts, support portals and a walkway. Associated works include relocation of 14 no. car parking bays and 1 no. EV charging point and ancillary works / 0.2 km away / 22 May 2024Granted