Bord Na Móna lands within the townlands of Cloonbony, Kilnacarrow Ballynakill Begnagh Corragarrow, and Cloonmore County Longford
Planning application 2460132
DecisionConditional grant
Decided26 November 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Longford County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Longford has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Bord Na Móna lands within the townlands of Cloonbony, Kilnacarrow Ballynakill Begnagh Corragarrow, and Cloonmore County Longford?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460215The proposed construction of a single storey bungalow type dwelling house, detached garage, entrance, boundary fence/wall, onsite suitable wastewater treatment system with percolation area & ancillary site works / 0.2 km away / 15 November 2024Granted
- 19223Proposed construction of a dormer bungalow type dwelling house with detached garage, entrance, boundary wall/fence, wastewater treatment system with percolation area and all ancillary site works / 0.2 km away / 21 October 2019Granted
- 26600394 no. floodlights, planning permission for 4 no. additional floodlights 4 no. ballstops and all ancillary site works / 0.2 km away / 23 March 2026Granted
- 257Alterations to facade/windows of existing gym, the proposed construction of 2 no. astroturf pitches, fencing, 6 no. additional floodlights, ball wall and all ancillary site works / 0.2 km away / 02 April 2025Granted
- 2560180The proposed change of use of an existing bungalow-type dwelling into a crèche/full-time early years education and afterschool service. The development will include the proposed construction of a single-story side extension, proposed decommissioning of existing septic tank system, proposed installation of a suitable onsite treatment system with polishing filter, a playground with perimeter fencing/wall, provision of on-site car parking and a drop-off area along with all associated site works, whereby it is now proposed to revise the site layout plan to include amendments to the traffic management and parking layout / 0.4 km away / 05 November 2025Granted
- 2460315Will consist of a battery energy storage system (BESS) located within a fenced compound and will (subject to detailed design, commercial and technical considerations) comprise of: 1) Up to 896 no. battery energy storage enclosures, organised in approx. 36 no. bays. Each battery enclosure will incorporate battery packs as well as power electronics, battery management systems, cooling units and fire suppression systems. The battery bays will be c. 5m wide x 3m high and vary in length from 33.7m to 36.3m; 2) 10 no. Medium Voltage (MV) Skids (c. 6m x 10.2m x 2.5m); 3) Control Building (c. 378.9 sq.m); 4) Ancillary plant and equipment comprising of: a. an emergency diesel generator plinth (c. 28.7 sq.m); b. two spare parts containers (c. 29.7 sq.m); c. a fire fighting water tank and pump house (c. 15 sq.m); d. an underground oil separator and repurposing of existing settlement basin to provide storm water attenuation; an underground emergency retention basin; e. transformer compound including a bunded main step-up transformer (c. 130 sq.m) and firewalls, and High Voltage (HV) switchgear, linking with an underground cable; and f. 4 no. auxiliary transformers (c. 4m x 4m x 3m); 5) Operation and Maintenance site office including welfare facilities (c. 25.5 sq.m); 6) All services connections including electrical, water and wastewater and connections to existing surface water drains; 7) 1 no. lightning monopole (c. 18m high); 8) Modifications to the permitted HV customer compound currently under construction (under Planning Application Reg. Ref. No. 22/275) to include the upgrade of the 110kV:33kV transformer with associated equipment including Circuit Breaker (CB), modifications to the transformer bund and control building; and 9) All other ancillary site clearance and development works including provision of biodiversity enhancement area; areas of hardstanding; internal access roads; lighting and CCTV; laydown area; fencing and access gates (c. 4m in height); car parking; and connections to site services networks. Note For Information Purposes: This application relates to elements previously consented by Longford County Council under Planning Application Reg. Ref. No. 22/75. It is expected that the already consented demolition of existing structures on site will occur in advance of the commencement of the construction of this proposed development. The demolition works, therefore, do not form part of this application. Planning Permission is being sought fo / 0.4 km away / 07 July 2025Granted
- 17209The proposed completion of existing partially constructed housing development to include the construction of 31 No. dwelling houses that was previously granted full planning permission under planning reference number PL04/272 consisting of 12 No. two storey three bedroom semi-detached type dwelling houses, 1 No. two storey three bedroom type dwelling house, 6 No. two storey four bedroom semi-detached type dwelling houses, 12 No. two storey two bedroom semi-detached type dwelling houses, completion of green open spaces, completion of existing access roads, proposed connections to existing foul sewer, surface water and watermain networks and all ancillary site works / 0.5 km away / 10 November 2017Granted
- 2275Development at the 13.1 Ha site known as 'Lough Ree Power (LRP) Station' located in Lanesborough (Lanesboro), in the townlands of Aghamore and Lanesborough, Eircode N37E180; in County Longford. The development will consist of the demolition of the existing LRP station (as approved under Longford County Council reg.ref 01/115 ' An Board Pleanala Ref. PL14.125540 and all subsequent permissions);and the development and operation of electricity grid services - namely a battery energy storage system (BESS) and a Synchronous Condenser (Sync Con). The proposed development comprises two distinct phases of activity - the initial demolition and site reinstatement (Phase 1); following by construction and operation of the new BESS and Sync Con (phase 2). Phase 1 comprises the demolition of existing site structures (with a total footprint of c. 11.195sq.m. and a total gross floor area of c. 20,000 sq.m) including the former LRP station (boiler house, turbine house, bag filter house and associated 80 m high stack); the intermediate peat storage building and associated fuel management system; and ancillary buildings including, electrical building, tippler building and associated control room and office, the screening building, lorry uploading building, water treatment plant building, offices building, laboratory building, workshop and maintenance buildings, oil pumphouse, electrics rooms, railway/locomotive service building, cooling water pump house and sewage/foul water treatment facility. All buildings and structures (including storage tanks and vessels) will be demolished to ground level, with below ground voids filled. Existing hard standing surfac3es (e.g. building ground floor concrete slabs, tarmacadam surfaces, concrete footpaths and road kerbs) will remain in site; and the site will be reinstated and secured with boundary gates and fences, etc. Associated with the demolition activity there will be on-site crushing of material using mobile machinery for the purposed of disposal and/or material re-use. Phase 2 comprises the proposed development of the BESS, Sync Con; and all associated development (Full description scanned/attached) / 0.5 km away / 08 December 2022Granted