The Spires District Regulating Installation (DRI), The Spires, Termonfeckin
Planning application 1853
DecisionConditional grant
Decided15 March 2018
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Louth County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Louth has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near The Spires District Regulating Installation (DRI), The Spires, Termonfeckin?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560831Permission for a dwelling house with attached garage, on site soakaway, new vehicular entrance, connection to public sewer and all associated site works / 0.1 km away / 13 February 2026Granted
- 17298Permission for modifications to a permitted residential development under ref. 16/308 known as Castle Park. The proposed development consists of a change of house type from 6 no. permitted 3 bed semi-detached houses to 6 no. proposed 4 bed semi-detached houses (i.e. unit no.s 56-57 & 59-62) and includes for all associated site development works. / 0.1 km away / 02 June 2017Granted
- 1772Permission for modifications to a permitted residential development under ref: 16/308. The proposed development consists of a change of house type from 2 no. permitted 3 bed semi-detached houses to 2 no. proposed 4 bed semi-detached houses (i.e. unit no.s 47 & 48) and includes for all associated site development works. / 0.2 km away / 30 March 2017Granted
- 17825Permission for development will consist of the following: 1. Construction of 4 no. 2-storey dwellings comprising of 2no. semi-detached 4 bedroom dwellings and 2no. semi-detached 3 bedroom dwellings along with car parking. 2. Driveway entrance to existing cottage to be closed off to Big Street. 3. New shared entrance to the development and existing cottage off Thunderhill Road. 4. All associated site works. / 0.2 km away / 14 December 2017Granted
- 21555Permission for amendments to previously granted planning permission Ref. No. 17/825 as follows: 1. Change in number of units from 4 no. to 2 no. dwellings. 2. Change in proposed house type from 2 storey dwellings to 1.5 storey detached dwellings. 3. Change to car parking and all associated site works*Significant Further Information received 15/9/21 which includes 1. Revised surface water details within the site. 2. Revisions to the proposed public footpath.* / 0.2 km away / 01 October 2021Granted
- 22420Permission for the construction of a new 2 storey dwelling house with mono pitch roof and a new detached garage/store along with alterations to existing entrance gates to form a combined entrance and all other associated site works / 0.2 km away / 22 September 2022Granted
- 24148Retention permission for a 2 storey dwelling as-built to include additional bedroom at first floor and associated alterations to elevations on foot of planning permission ref. 21/555. / 0.2 km away / 11 April 2025Granted
- 18940Permission for development to consist of the construction of a 2 storey three bedroom end of terrace dwelling to side of existing house with parking to the front as well as all associated site works. *Significant Further Information received on 15/08/2019* / 0.2 km away / 06 September 2019Granted