Units 3 & 4 Bloomsbury Centre, Donore Road, Drogheda Co Louth
Planning application 20463
DecisionConditional grant
Decided13 August 2020
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Louth County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Louth has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Units 3 & 4 Bloomsbury Centre, Donore Road, Drogheda Co Louth?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 17835Permission for development for change of use from retail shop to veterinary surgery at unit 3. Alterations to existing rear elevations at unit 3 & 4. Permission for retention of an unathorised use consisting of an existing mezzanine storage area at first floor level to rear of unit 4 and all associated works at units 3 & 4. / 0.0 km away / 15 December 2017Granted
- 22334Retention permission for Unit No. 1 (known as 'Lituanica') as a supermarket with gross floor area of 370.6sqm (net retail area of 292.0sqm). Permission sought for the amalgamation of Unit No. 1 and Unit No. 2 (Unit No. 2 is vacant at present) for use as a supermarket incorporating use as an off-licence. The amalgamated units will have an overall gross floor area of 490.6sqm (net retail area of 391.7sqm). Permission also sought for a new shopfront to Units 1 and 2 incorporating new signage/lighting and all related site development works / 0.0 km away / 17 June 2022Granted
- 21752Permission for development that will consist of 1) a two storey extension to apartment Block A comprising 20 no. apartments including 10 no. 1 bed apartments and 10 no. 2 bed apartments 2) A two storey extension to apartment Block B comprising 16 no. apartments including 8 no. 1 bed apartments and 8 no. 2 bed apartments. 3) Provision of 88 bicycle parking spaces. 4) All associated site development works including; landscaping, roof gardens, site lighting, play areas, bin stores, signage, boundary treatments and services infrastrucutre / 0.1 km away / 10 January 2022Granted
- 20275Permission for amendments to previously permitted development granted under PL18176 for development at site previously used as the Roadstone Batching Plant that incorporates the lower section of the previous batching plant, bounded by Donore Road to the north, the Watery Steps to the east, the upper section of the batching plant to the south and the Bloomsbury Centre to the west. The amendments to the development will consist of A. Removal of the basement car park and proposed 28 no. surface car parking spaces located to the rear of Block A. B. Modification of the 66 apartment layouts to accommodate elderly residents, comprising of 4 no. 1 bedroom apartments, 54 no. 2 bedroom apartments and 8 no. 3 bedroom apartments. The total number and mix of units and gross floor areas have not changed. C. Modification to the elevations and sections to reflect the amended apartment layouts. D. Minor modification of the positioning of the 3 blocks on the site and their composition. E. Modification of the communal facility, bin stores and general landscaping. F. Adjustment of the existing vehicular site access off Donore Road and introduction of two new pedestrian site access points; one at the foot of the Water Steps with a proposed ESB substation and a second access point off Donore Road, all as granted under PL 18176. G. All associated amendments to roof plant, site lighting, signage, services, landscaping, external furniture, related infrastructure and site development works in conjunction with the amendments noted in points A-F / 0.1 km away / 28 August 2020Granted
- 18176PERMISSION for development will consist of: - The demolition of all existing structures on site including the batching silos, aggregate bins, offices, single storey building, diesel tank, existing entrance gates etc., and part demolition/adjustments to the existing stone boundary wall at the Donore Road and Watery Steps. - Removal of a number of existing trees along the Donore Road and Watery Steps borders - Construction of 3 no. part 4/part 5-storey buildings containing 66 no. residential units and associated communal spaces, managers office, 185m2 community facility, laundry room, planted courtyards and paths, and refuse store, over semi-basement containing 54 no. car parking spaces, cycle storage, plant and tenant storage. - The residential element consists of 30 sheltered housing units and 36 general needs housing units with a split of 4 no. 1 bedroom apartments, 54 no. 2 bedroom apartments and 8 no. 3 bedroom apartments. - Relocation of the existing vehicular site access off Donore Road and introduction of two new pedestrian site access points; one at the foot of the Watery Steps with a proposed ESB substation, and a second access point off Donore Road. - All associated roof plant, site lighting, signage, services, landscaping, external furniture, related infrastructure and site development works. / 0.1 km away / 22 June 2018Granted
- 2660111Retention of a single storey flat roof extension and single storey domestic stores all located to the rear of the existing dwelling house, inclusive of all associated site development works / 0.1 km away / 17 April 2026Granted
- 18414The development will consist of the construction of extension to rear of exsisting dwelling consisting of kitchen extension, Utility room, toilet and study/Living room aswell as all associated site works. / 0.1 km away / 12 July 2018Granted
- 21930Permission for the provision of a single storey prefab staff facility with ancillary ramps and services. *Significant Further Information received on 23/09/2021* / 0.1 km away / 14 October 2021Granted