Rokeby Hall, Rokeby, Grangebellew Drogheda
Planning application 21802
DecisionConditional grant
Decided12 August 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Louth County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Louth has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Rokeby Hall, Rokeby, Grangebellew Drogheda?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360442Permission for a facility for the recovery of waste concrete (17 01 01) and waste asphalt (17 03 02 - bituminous mixtures other than those mentioned in 17 03 01) on a 1.3ha area at Gallstown Quarry, as conducted previously at this site. The recovered materials will meet the Environmental Protection Agency End of Waste Criteria. A Waste Facility Permit will be sought for this activity *SFI received on 13.2.24 includes removal of asphalt waste from the development description. The development will consist of a facility for the recovery of waste concrete (17 01 01) on a 1.3ha area at Gallstown Quarry, as conducted previously at this site.** / 0.6 km away / 08 March 2024Granted
- 19166Permission for a proposed storey and a half dwelling house, domestic garage, treatment system and polishing filter, new vehicular entrance and all associated site development works. *Significant Further Information Received on 02/08/2019* / 0.7 km away / 23 August 2019Granted
- 21646Permission for a proposed dwelling house, domestic garage, waste water treatment system and polishing filter percolation area, new vehicular entrance and all associated site development works / 0.8 km away / 14 October 2021Granted
- 23441Permission for (a) 2 no. 3 bay covered aggregate storage sheds (each gross floor space 1,177sqm, maximum height 10m); (b) a Reclaimed Asphalt Pavement (RAP) milling plant with two covered storage bays and all ancillary works / 0.8 km away / 06 December 2023Granted
- 2424Retention permission for the change of use of a domestic garage to a home office and domestic store ancillary to the main use of the dwelling house inclusive of all associated site development works / 0.9 km away / 18 April 2024Granted
- 2362Permission for a temporary period of three years for development on a site of c. 1.1 hectares on lands located in Gallstown, for the continuation of use of the readymix batching plant, prefabricated sales/site office, canteen/washroom (welfare) facilities, car parking area, aggregate storage bays, water recycling ponds and truck washout and all associated plant, permitted under ref. no. 01/1370 (ABP ref. no. PL15.128833). There are no physical changes proposed to these existing permitted buildings, ancillary infrastructure and plant on the site. There are no changes proposed to the permitted operating hours of 07.00hrs to 20.00hrs, Monday to Friday and 07.00hrs to 14.00hrs Saturday / 0.9 km away / 31 March 2023Granted
- 21994Retention of existing replacement septic tank and percolation area with a new mechanical waste water treatment system and raised polishing filter / 0.9 km away / 15 December 2021Granted
- 21220Permission for the construction of a new extension to the existing semi-detached dwelling house consisting of a kitchen/dining room and sitting room at ground level, an attic storage area, alterations to the existing dwelling house and relocation of the existing roadside entrance gates, along with all associated site works. *Significant Further Information received on 08/06/2021 which includes replacement septic tank and percolation area, new soak pit and revised front elevation* / 0.9 km away / 24 June 2021Granted