Ballygowan, Ardee, Co Louth
Planning application 22977
DecisionConditional grant
Decided14 July 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Louth County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Louth has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballygowan, Ardee, Co Louth?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Source documents
Original council portal records and source PDFs where available.Included in site brief
1 council document — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- 21660Retention Permission and Permission for development consisting of the retention of an existing agricultural shed and access road including alterations to the existing entrance, the construction of an effluent tank, the construction of a silage slab, the construction of a concrete apron and associated site works. *Significant Further Information received on 21/12/2021* / 0.4 km away / 20 January 2022Granted
- 22893Permission for the construction of a horticultural storage unit and an agricultural storage unit and for associated site works. *Further Information received on 14/06/2023* / 0.9 km away / 06 July 2023Granted
- 2460541Permission for the construction of a two storey house, waste water treatment unit and percolation area and new entrance onto the public road *Significant Further Information Received on 07/11/2024* / 0.9 km away / 02 December 2024Granted
- 20433Permission for the construction of an agricultural entrance to farmlands and for associated site works / 1.0 km away / 04 March 2021Granted
- 2660176Planning permission for the Demolition of existing single storey detached dwelling, and construction of a dormer style detached replacement dwelling, new vehicular entrance onto public roadway, driveway, wastewater treatment system, percolation area, landscaping and all associated site works / 1.1 km away / 10 July 2026Granted
- 18342Retention permission for a development consisting of the retention of a porch to the side of the house and for the change of use of a domestic garage into a family room and study. / 1.2 km away / 19 July 2018Granted
- 211482Part 8 - Louth County Council hereby gives notice of it's intention to carry out the following development: Realignment of the N52 National Secondary Route in the townlands of Mandistown, Co Meath, Ballygowan, Bohernamoe, Townparks, Mullanstown and Glebe in County Louth, comprising the construction of a single carriageway road for a distance of 4.5km from a location 150m north of the N33/N2/R171 roundabout junction on the N2 in the townland of Glebe. The N52 realignment will typically consist of a 7.0m wide carriageway with 2 x 0.5m hard strips and a 2.5m wide verge. Where a footway/cycleway is provided, the verge will be widended to 5.0m to accommodate a 3.0m shared footway/cycleway facility on one side of the road. Ghost island junctions will be located at the L-5234 Silverhill Road staggered T junction, the L-5232 Townparks Road staggered T junction and the L-1233 Mullanstown Road T junction north, with the southern arm of the Mullanstown Road stopped up. A new multi-lane roundabout is provided at the junction with the N2 in the townland of Glebe. The L-5234 Silverhill Road is realigned for 500m and a new single lane roundabout is provided at the junction with the existing N52. South of the Silverhill Road roundabout, the existing N52 will be reclassified as a local road and stopped up south of Burley Bridge. Localised realignment of the Silverhill Road, Townparks Road and Mullanstown Road (north) is required to connect them to the proposed N52 Ardee Bypass. Two new bridge crossings, each with an approximate span of 30m are provided at the River Dee and River Garra, with monir watercourses cuverted under the proposed road. The remaining works will consist of earthworks, pavement works, attenuation features, the connecton of road/land drainage outfalls ot the new sustainable urban drainage system (SuDS) network, completion of landscaping and accommodation works, implementation of environment measures and all other ancillary works. Full plans and particulars are available at www.louthcoco.ie / 1.4 km away / 05 May 2022Granted
- 17863Permission for development will consist of proposed storey and a half style side extension & front porch to existing dwelling, removal of existing garage and new detached domestic garage to revised location and all associated works. **SIGNIFICANT FURTHER INFORMATION RECEIVED 03/04/2018 to allow for revised plans to reduce the proposed extension to dwellinghouse to single storey in nature in relation to the application.** / 1.7 km away / 27 April 2018Granted