BELLACORICK, BALLINA, CO. MAYO
Planning application 18190
DecisionConditional grant
Decided14 May 2018
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Mayo County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Mayo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near BELLACORICK, BALLINA, CO. MAYO?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 18274DECOMMISSIONING AND REMOVAL OF ELECTRICAL PLANT AND ASSOCIATED STRUCTURES AND THE DEMOLITION OF THE EXISTING FENCE ALONG A PORTION OF THE NORTH EASTERN BOUNDARY OF THE EXISTING SUBSTATION, THE EXTENSION OF THE EXISTING SUBSTATION BY 3970sq m TO ACCOMMODATE c. 30m OF OVER HEAD 110kV CONDUCTOR CONNECTING TO AN EXISTING 110 kV BUSBAR AND ASSOCIATED STRUCTURES c. 16m HIGH, INCORPORATING LIGHTENING PROTECTION MEASURES, 1 NO. 38/110kV BUNDED TRANSFORMER, AND ADDITIONAL 38 kV ELECTRICAL EQUIPMENT SUCH AS ARC SUPPRESSION COIL, CABLE CHAIRS/SEALING ENDS, ETC. ALL ANCILLARY WORKS WITHIN THE SITE INCLUDING THE PROVISION OF ADDITIONAL AREAS OF HARD-STANDING, INTERNAL ACCESS-WAYS, ASSOCIATED DRAINAGE WORKS AND ALL WORKS ASSOCIATED WITH REMOVAL, RELOCATION, REPLACEMENT AND INSTALLATION OF UNDERGROUND CABLES, ELECTRICAL PLANT AND SWITCHGEAR ON THE SITE, AND A 2.6m HIGH PALISADE PERIMETER FENCE WITH A DEDICATED ACCESS GATE / 0.0 km away / 12 June 2018Granted
- 23162Synchronous condenser/flywheel, located within a fenced compound of c.0.85 ha consisting of: machine building to house equipment including the synchronous condenser, flywheel, lube oil skid, air compressor and pumps. Supporting items of plant; cooling equipment, c.6m high modular containers to house electrical and control equipment, 2 auxilliary transformers and electrical plant including external circuit breaker, HV electrical compound with electrical switchgear and main step-up transformer and new c.200m underground cable grid connection to the Bellacorick 110kv substation; diesel generator, fire water tank, underground oil separator and collection pit, services connections including electrical, water and wastewater and constructed wetland connecting ot Owenmore River; 3 office/welfare buildings and 2 spare parts containers. External lighting poles c. 9m, lightning monopole and Scada communications mast,. 4 fire walls around main step up transformer c. 8m high, 2 fire walls either side of auxilliary transformers c. 5m high, 3 firewalls around cooler for main transformer, 8m high. Ancillary site clearance and developemt works including provision of areas of hardstanding, internal access roads, laydown area, car parking and connection to site services networks. The development will be bounded by one c. 3.6m high palisade fence on the east side and one 5m high palisade fence to the south side. Site access will be by means of a new c. 3.6m high palisade gate and a second 3.6m sliding gate accessed from the Shranakilla Road off the N59. Permission sought is for 10 years. NIS submitted with application. / 0.1 km away / 03 August 2023Granted
- 17419CONTINUE THE USE OF THE EXISTING 36 METRE HIGH, FREE STANDING LATTICE TYPE COMMUNICATIONS STRUCTURE, CARRYING ANTENNAE AND COMMUNICATION DISHES WITHIN AN EXISTING 2.4 METRE HIGH PALISADE FENCE COMPOUND PREVIOUSLY GRANTED TEMPORARY PERMISSION UNDER P11/645 AND PERMISSION TO ATTACH 3 X 2.6M PANEL ANTENNA FOR THIRD PARTY CO-LOCATION AT ESB TELECOMS LTD TELECOMMUNICATION COMPOUND AT BELLACORRICK, BALLINA / 0.2 km away / 24 July 2017Granted
- 221081Construct new dwelling house, construct new domestic garage, construct new effluent treatment system with all associated works, construct new domestic entrance off public road and carry out all required ancillary works on site / 0.6 km away / 11 September 2023Granted
- 20270DEVELOPMENT WILL CONSIST OF 1 NO. 4.5M X 3.5M X 3M HIGH (14.6SQM) PREFABRICATED GLASS REINFORCED PLASTIC (GRP) ANALYSER KIOSK, 1NO. 3M X 2.5M X 2.3M HIGH (6.8SQM) PREFABRICATED GRP GENERATOR KIOSK AND 1 NO. 3.5M X 3.5M X 3M HIGH (11.3SQM) PREFABRICATED GRP ANALYSER SUPERVISORY KIOSK. THE DEVELOPMETN WILL ALSO INCLUDE THE REPLACEMENT OF THE EXISITNG 2.45M HIGH CHAIN LINK PERIMETER FENCING WITH NEW 2.4M HIGH PALISADE SECURITY FENCING/GATES AND ALL ASSOCIATED SITE WORKS. / 0.9 km away / 14 July 2020Granted
- 2354Continued temporary use of the existing Western Way Bridge Bypass on the N59 (at the N59/R312 junction). The existing bypass will facilitate turbine component delilveries to the consented Sheskin Wind Farm (Planning Reg. Ref. P19/457). The existing bypass consists of an upgraded access track and a stream crossing. The stream crossing will be removed following the delivery of turbine components to Sheskin Wind Farm. (A NIS has been submitted.) / 1.0 km away / 30 March 2023Granted
- 17826RETENTION FOR EXISTING 36M TELECOMMUNICATIONS SUPPORT STRUCTURE, WITH 2M HIGH HEADFRAME FIXED TO TOP, GIVING OVERALL HEIGHT OF 38M, CARRYING ASSOCIATED ANTENNA AND LINK DISHES, ASSOCIATED CABIN, CABINETS, SECURITY FENCING AND ACCESS TRACK (PREVIOUS REF NO. P10/888 REFERS) / 1.2 km away / 13 December 2017Granted
- 2360028The development will consist of a 114 Megawatt gas fired peaking power plant (which will be capable of running on a mix of natural gas and hydrogen) comprising the ’electricity generating station’. The electricity generating station will comprise of 2 no. open cycle gas turbine (OCGT) generators each consisting of an air intake filter system, exhaust stack (28 metres high), air vent stack, inter cooler system, turbine control room and transformers. In addition the development will include: • Above Ground Installation (AGI) to facilitate connection to the Gas Network, with compound area of 1,600 m²; • 3 no. Gas AGI buildings; • Admin & welfare block; • Electrical Substation with area of 3,800 m²; • 1 no. Substation building; • Electrical building; • 3 no. Secondary fuel storage tanks with volume of 3,600 m³; • Fire Water Storage Tank & Pumphouse; • Sludge Tank & Pump House; • Resurfacing, Repair and Improvement of Existing Site Entrance; • Replacement Bridge; • Gatehouse; • Internal Access Roads; and • Associated Grid Connection Works within the L52925 Public Roadway. The development will include the provision of 12 no. parking spaces, footpaths, landscaping, fencing and all other associated site development plant and equipment and other works including surface water and foul wastewater drainage infrastructure. The development includes for the demolition and removal of a dwelling (112 m²) and associated farmyard barn and outbuildings (94 m², 15 m², 17 m² and 45 m²), all within a total overall application boundary of 4.35 ha. It should be noted in respect of this planning application that permission is sought for a period of 25 years. / 1.5 km away / 22 December 2023Granted