Mullafarry and Tawnaghmore Lower, Killala, Co. Mayo
Planning application 19260
DecisionConditional grant
Decided10 September 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Mayo County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Mayo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Mullafarry and Tawnaghmore Lower, Killala, Co. Mayo?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 1761910 YEAR PLANNING PERMISSION FOR 5 TURBINE WIND FARM. PROPOSED DEVELOPMENT WILL BE LOCATED IN THE TOWNLANDS OF MAGHERABRACK, MULLAFARRY, TAWNAGHMORE LOWER, MEELICK AND TAWNAGHMORE UPPER, KILLALA APPROX 1.3KM SOUTH OF KILLALA. DEVELOPMENT IS AN UPDATED APPLICATION TO THE CONSENTED 6 TURBINE WIND FARM P09/780. PROPOSAL IS FOR A WIND ENERGY DEVELOPMENT COMPRISING 5 ELECTRICITY GENERATING WIND TURBINES, EACH WITH A ROTOR DIAMETER NOT EXCEEDING 103.2M A HUB HEIGHT NOT EXCEEDING 73.5M AND A BLADE TIP HEIGHT OF NOT EXCEEDING 126M. THE DEVELOPMENT WILL INCLUDE A METEOROLOGICAL MAST NOT EXCEED 82M IN HEIGHT, INTERNAL UNDERGROUND ELECTRICAL CABLING, A SUBSTATION BUILDING, AN EXTERNAL UNDERGROUND GRID CONNECTION CABLE AND DUCTING TO THE EXISTING 110KV TAWNAGHMORE SUBSTATION, ASSOCIATED GRID SUBSTATION WORKS, ASSOCIATED SITE ACCESS ROADS AND ANCILLARY SITE WORKS INCLUDING UPGRADES TO EXISTING SITE ACCESS, A TEMPORARY CONSTRUCTION COMPOUND AND HAULAGE ROUTE WORKS. THE MAX OUTPUT CAPACITY OF THE WIND FARM WILL BE UP TO 18MW AND HAS AN INTENDED OPERATION LIFE OF 25 YEARS / 0.1 km away / 11 January 2018Granted
- 201225 YEAR PERMISSION FOR AN ENERGY STORAGE FACILITY. THE DEVELOPMENT WILL COMPRISE OF A COMPOUND CONTAINING 4 NO. ENERGY STORAGE CONTAINERS WITH A CAPACITY OF UP TO 15MV AND ASSOCIATED TRANSFORMERS, SWITCHGEAR, A PRIMARY METERING CABINET, AN AUXILIARY TRANSFORMER UNIT, ELECTRICAL CABLE DUCTING OF APPROX 112M AND COMMUNICATIONS CABLE DUCTING OF APPROX 124M TO CONNECT TO THE EXISTING 38KV SUBSTATION ON THE KILLALA COMMUNITY WIND FARM SITE AND ALL ANCILLARY DEVELOPMENT / 0.7 km away / 25 June 2020Granted
- 2360182The development will consist of an Inert Waste Recovery Facility within an application area of c. 1.8 Ha. / 0.7 km away / 01 February 2024Granted
- 2560108The development will consist of the following elements: • Battery Energy Storage System facility, consisting of battery containers with integrated HVAC (Heating, Ventilation, Air Conditioning) units, transformers, inverters, underground cabling, associated control rooms, internal access routes, lighting, CCTV, lightning masts, fencing; • Associated Electrical Compound consisting of: Low voltage operations compound including one (1) single storey control and operational building, electrical plant, cabling, lighting, CCTV, lightning masts, diesel generator and diesel tank, operations and maintenance containers and stores; • High voltage electrical yard comprising outdoor electrical plant and associated compound; • Underground high voltage electrical cable to facilitate a connection to the existing adjacent 110kV Tawnaghmore substation; • Associated landscaping, drainage, decommissioning of existing septic tank and all ancillary works necessary to facilitate the development A 10-year permission is sought in respect of the development. Certain details of the proposed development are unconfirmed in the planning application, and an opinion on unconfirmed details accompanies the application. The Tawnaghmore Power Station has an Environmental Protection Agency (EPA) issued Industrial Emissions (IE) Licence (Reg, No. P0566-02). / 0.7 km away / 24 April 2025Granted
- 18358A BATTERY STORAGE FACILITY WITHIN A TOTAL SITE AREA OF UP TO 1.18ha, TO INCLUDE 55 NO. SELF CONTAINED BATTERY CONTAINER UNITS WITH ASSOCIATED HVAC COOLING UNITS, 15 CONVERTER AND 15 SET UP TRANSFORMER CONTAINER UNITS, ASSOCIATED COMPOUND CABLING AND DUCTING, A GRID TRANSFORMER, A SINGLE STOREY SUBSTATION/CONTROL BUILDING WITH WELFARE FACILITIES, A CABLE ROUTE GRID CONNECTION TO THE EXISTING ESB SUBSTATION BUILDING, MAINTENANCE LIGHTING, SECURITY FENCING, A CCTV MONITORING SYSTEM, LANDSCAPING WORKS AND ALL ASSOCIATED ANCILLARY INFRASTRUCTURE ON LANDS WITHIN THE TAWNAGHMORE GENERATION STATION. A TEN YEAR PLANNING PERMISSION IS BEING SOUGHT TO CONSTRUCT THE DEVELOPMENT / 0.7 km away / 13 December 2018Granted
- 21708CONTINUED USE AND OPERATION OF THE EXISTING LIMESTONE QUARRY (C. 3.97 HA) INCLUDING WHEELWASH, SETTLEMENT LAGOONS, PORTABLE OFFICE, WORKSHOP AND ALL ASSOCIATED ANCILLARY ACTIVITIES, PERMITTED UNDER PLAN REG. REF. NO. 02/1931 AND 08/1563; INSTALLTION OF A PACKAGED WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER / 0.7 km away / 11 January 2022Granted
- 22464CONSTRUCT NEW CLUBHOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT AND PERCOLATION AREA INCLUDING ALL ANCILLARY SITE WORKS / 0.8 km away / 22 July 2022Granted
- 181017CONSTRUCT A 4 BAY CALVING SHED, REPLACE EXISTING 4 BAY DOUBLE SHED OVER EXISTING SLATTED TANK WITH NEW 4 BAY DOUBLE ALONG WITH CUBICLE EXTENSION AND ALSO THE EXTENSION TO EXISTING COLLECTING YARD AND CONSTRUCTION OF A 2 BAY SLATTED UNDERGROUND SLURRY STORAGE TANK ALONG WITH ALL ASSOCIATED SITE WORKS / 0.9 km away / 14 February 2019Granted