KEERGLEN, BALLYCASTLE, BALLINA
Planning application 19880
DecisionConditional grant
Decided17 December 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Mayo County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Mayo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near KEERGLEN, BALLYCASTLE, BALLINA?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 25427Construction of a single storey extension to rear elevation of existing semi habitable house, construction of entrance porch and three additional windows to existing front elevation of semi habitable house, construction of new raised roofline to existing semi habitable house (from 4.5m to 5.3m ridge height), construction of waste water treatment system and percolation area, complete with boundary treatment, parking and all ancillary site development works / 0.0 km away / 21 May 2026Granted
- 20347Construct dwelling house, proprietary effluent treatment system, percolation area and detached domestic shed / 0.7 km away / 25 January 2021Granted
- 22542SINGLE STOREY EXTENSION TO REAR OF EXISTING DWELLING HOUSE, SINGLE STOREY EXTENSION TO FRONT OF EXISTING DWELLING HOUSE (INCLUSIVE OF REPOSITIONED WINDOW TO WEST ELEVATION OF EXISTING GABLE WALL), COMPLETE WITH ALL ANCILLARY SITE DEVELOPMENT WORKS / 1.9 km away / 22 August 2022Granted
- 259Construct single storey dwelling house with upstairs accommodation, domestic garage, boundary fencing/treatment and septic system, complete with all ancillary site development works / 2.4 km away / 25 June 2025Granted
- 2460537A ten year permission for the development of a wind farm project. The development will consist of: - the construction of up to 8 No. wind turbines with a maximum overall tip height of between 176-180m, comprising rotor diameters ranging between 133-150m and hub heights ranging between 105-112m high; - associated wind turbine foundations and hard stand areas at each turbine; - 1 No. 38kV electrical substation building, compound and associated infrastructure works; - 1 No. temporary welfare site compound and associated works; - 20kV underground cables facilitating the connection of turbines to 38kV electrical substation and all associated infrastructure and works; - provision of a new temporary roadway connecting the R315 and the L51723 in the townland of Ballinglen to facilitate the delivery of turbine components and other abnormal loads; - widening and ancillary works to sections of the L51723 in the townlands of Keerglen and Ballykinlettragh; - provision of new permanent site access off the L51723; - upgrading of existing agricultural tracks and drainage infrastructure, and construction of new internal site tracks and all associated works as required; - construction of a clear-span bridge crossing the Keerglen River within the development area; - 1 no. borrow pit; - designated peat storage areas alongside internal side roads; - site drainage; - ancillary forestry felling to facilitate construction and operation of the proposed development; - all associated infrastructure and site development works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted with the application. / 3.0 km away / 10 November 2025Granted
- 2560104The proposed development consists of: One temporary for a period of three years, 100m high cable stayed triangular steel lattice tower meteorological mast fixed upon a wooden sleeper base of 2.4m x 2.4m; One lightning finial fitted to the higher level of the mast; One anti-climb device fitted to the lower level of the mast; 12 no. buried ground anchors located within three ‘lanes’ at 21m, 42m, 56m and 60m radii from the mast base; Meteorological instrumentation for measuring local climate conditions fixed to the meteorological mast including but not limited to: anemometers, wind vanes, temperature & pressure sensors; Shelter box with data logger and 100W photovoltaic panel fitted to the lower level of the mast; Bird flight deterrents discs fitted to each guy wire at approximately 10m intervals; Obstacle warning light fitted to the higher level of the mast; All associated infrastructure and ancillary works. A Natura Impact Statement has been prepared and will be submitted with the planning application. / 3.2 km away / 22 April 2025Granted
- 25408Retain dwelling house and upgrade septic tank to proprietary effluent treatment system and all ancillary site works / 3.6 km away / 08 June 2026Granted
- 25501Retain dwelling house and all ancillary site works / 4.0 km away / 13 February 2026Granted