MAYO UNIVERSITY HOSPITAL, CASTLEBAR
Planning application 20173
DecisionConditional grant
Decided01 September 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Mayo County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Mayo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near MAYO UNIVERSITY HOSPITAL, CASTLEBAR?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2188CONSTRUCTION OF A PART SINGLE PART TWO STOREY FLAT ROOF DWELLING WITHIN THE CURTILAGE OF AND ATTACHED TO NO. 36; THE DEMOLITION OF AN EXISTING REAR GARDEN SHED AT NO. 36 AND CONSTRUCTION OF A REAR GARDEN SHED AT NO. 35; RECONFIGURATION/MODIFICATION OF SITE LAYOUT, PRIVATE OPEN SPACES, BOUNDARIES AND ACCESS POINTS; AND ALL ASSOCIATED AND ANCILLARY WORKS AND DEVELOPMENT ABOVE AND BELOW GROUND INCLUDING CONNECTIONS TO SERVICES / 0.1 km away / 19 July 2021Granted
- 1984CHANGE OF USE OF EXISTING GROUND FLOOR OFFICE/RECEPTION AREA, SEMINAR ROOM & LAUNDERETTE AREA (PART OF) ALL LOCATED IN BLOCK B TO 2 NO. ONE-BED APARTMENTS AND REDUCED LAUNDERETTE AREA INCLUDING NEW ACCESS DOOR TO LAUNDERETTE AREA / 0.1 km away / 09 July 2019Granted
- 22627NEW CT SUITE AND ASSOCIATED ROOMS. THE PROJECT IS APPROXIMATELY A 140 SQ METRE SINGLE STOREY STRUCTURE WITH ROOFTOP PLANT AND WILL BE LOCATED WITHIN AN EXISTING COURTYARD CENTRAL TO THE HOSPITAL CAMPUS FACING SOUTH EAST. THE WORKS INCLUDE DRAINAGE, WORKS TO THE EXISTING STREET, AND ALL ANCILLARY SITE WORKS / 0.1 km away / 21 September 2022Granted
- 2360192The proposed development will consist of the construction of a two storey rear extension with all associated site works / 0.1 km away / 21 July 2023Granted
- 17393CONSTRUCT NEW DEN AND ANCILLARY SITE WORKS / 0.1 km away / 27 September 2017Granted
- 2460166The development will consist of the relocation and modification of the existing Temporary Covid Modular Building and all other necessary ancillary site works. Site-wide signage will be erected to provide clear way finding and health and safety information / 0.1 km away / 08 May 2024Granted
- 2360331A NEW MODULAR OFFICE BUILDING (252 SQ METRES). A NEW CANOPY ROOF OVER THE ENTRANCE TO THE ORIGINAL MAIN ENTRANCE (1940s BUILDING). A NEW GAS STORAGE COMPOUND, EXTERNAL STEPS AND PARKING. WORKS INCLUDED DRAINAGE WORKS TO CONNECT TO THE EXISTING SITE SERVICES AND ALL ANICLLARY SITE WORKS / 0.1 km away / 10 October 2023Granted
- 2560153(1) a change of use from Office use to Day Services use, with all associated site works at The Mosaic Centre, Harlequin Plaza, Garvey Way, Castlebar, Co. Mayo F23 X821. / 0.2 km away / 24 June 2025Granted