MULLAFARRY, KILLALA
Planning application 20644
DecisionConditional grant
Decided04 March 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Mayo County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Mayo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near MULLAFARRY, KILLALA?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 17579CONSTRUCT A CATTLE UNDERPASS AND EFFLUENT TANK UNDER THE PUBLIC ROAD AND ASSOCIATED SITE WORKS / 0.1 km away / 16 February 2018Granted
- 21708CONTINUED USE AND OPERATION OF THE EXISTING LIMESTONE QUARRY (C. 3.97 HA) INCLUDING WHEELWASH, SETTLEMENT LAGOONS, PORTABLE OFFICE, WORKSHOP AND ALL ASSOCIATED ANCILLARY ACTIVITIES, PERMITTED UNDER PLAN REG. REF. NO. 02/1931 AND 08/1563; INSTALLTION OF A PACKAGED WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER / 0.5 km away / 11 January 2022Granted
- 18753CONSTRUCT A ROOFED COLLECTING YARD, A CALF SHED, A FARM YARD MANURE SHED AND ALL ASSOCIATED SITE WORKS / 0.6 km away / 26 November 2018Granted
- 2360182The development will consist of an Inert Waste Recovery Facility within an application area of c. 1.8 Ha. / 0.6 km away / 01 February 2024Granted
- 2112841.0 HECTARE EXTENSION TO AN EXISTING AUTHORISED QUARRY AND WILL COMPRISE OF THE FOLLOWING: EXTRACTION OF MATERIAL BY BLASTING MEANS DOWN TO A LEVEL OF -2.0mOD; TRANSPORTATION OF EXTRACTED MATERIAL TO THE EXISTING QUARRY FOR PROCESSING; LANDSCAPING AND RESTORATION OF THE SITE UPON COMPLETION OF WORKS AND ALL ASSOCIATED ANCILLARY FACILITIES. THE APPLICANT IS SEEKING A 10 YEAR PERMISSION / 0.7 km away / 23 September 2022Granted
- 2460708The construction of a single data centre building located to the north of the site, with an overall gross floor area of c. 29,076 sq.m across two levels and an overall maximum height of c. 22.764m at parapet level. The data centre building includes data halls and associated electrical and mechanical plant rooms (c. 23,908 sq.m), an administrative and staff services block (c. 5,052 sq.m) and circulation and stairs (c. 116 sq.m). 2 no. external terraces are proposed to the east of the building (c. 309 sq.m) and an external generator yard to the south of the building (c. 5,205 sq.m) accommodating 25. no. backup / dispatchable generators and associated flues (to a height of c. 21.164m) within an enclosed compound. The construction of a sprinkler tank and pump house to the northeast of the site, the sprinkler tank is an overall height of c. 7.2 m and the pump house is a single storey building with an overall height of c. 4.15m and area GFA of c. 40.23 sq.m. The construction of an entrance hut at the main access to the south of the site, the hut is an overall height of c. 3.225m and area GFA of c. 11.6 sq.m. Construction of 2 no. site access points from the south and internal road network and circulation areas, footpaths, cyclist infrastructure, the provision of 56 no. car parking spaces (including 12 EV charging spaces and 7 disabled spaces, 3 of them EV), 20 no. cycle parking spaces, hard and soft landscaping and planting, site lighting, PV panels and plant at roof level, foul water connection connecting to existing WWTP in Killala Business Park, boundary treatments, green walls and all associated and ancillary works including underground foul and storm water drainage network and utility cables and all ancillary works and services. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority. / 0.7 km away / 25 April 2025Granted
- 201225 YEAR PERMISSION FOR AN ENERGY STORAGE FACILITY. THE DEVELOPMENT WILL COMPRISE OF A COMPOUND CONTAINING 4 NO. ENERGY STORAGE CONTAINERS WITH A CAPACITY OF UP TO 15MV AND ASSOCIATED TRANSFORMERS, SWITCHGEAR, A PRIMARY METERING CABINET, AN AUXILIARY TRANSFORMER UNIT, ELECTRICAL CABLE DUCTING OF APPROX 112M AND COMMUNICATIONS CABLE DUCTING OF APPROX 124M TO CONNECT TO THE EXISTING 38KV SUBSTATION ON THE KILLALA COMMUNITY WIND FARM SITE AND ALL ANCILLARY DEVELOPMENT / 0.8 km away / 25 June 2020Granted
- 21342FILLING OF LANDS WITH INERT WASTE FOR THE PURPOSE OF QUARRY RESTORATION, AND ALL ASSOCIATED ANCILLARY WORKS / 0.8 km away / 22 November 2021Granted