CORRAUN, COURSE, BALLYHAUNIS
Planning application 21798
DecisionConditional grant
Decided12 April 2022
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Mayo County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Mayo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near CORRAUN, COURSE, BALLYHAUNIS?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 22475Raise the level of excavated land of approximately 1.567 Hectares, within an extant sand and gravel Quarry at Corraun, Ballyhaunis, Co. Mayo, by importing approximately 100,000 tonnes of inert soil and stone and all associated site works over a five year period. A waste facility permit will also be required. / 0.2 km away / 23 September 2022Granted
- 2660220Finnegans Sand Limited intends to apply to Mayo County Council for planning permission for development at this site The development will consist of the proposal for recovery and recycling of construction and demolition materials and inert soil and stone within a portion of an extant quarry in a site area of circa 1.6 ha. The proposed development is within the same footprint as Waste Facility Permit No. WFP-MO-22-0064-01 which is due to expire in January 2028. Upon the grant of planning, a separate Waste Facility Permit will be sought from Mayo County Council and an End of Waste Declaration will be submitted to the EPA for this activity. Planning is sought for six years and will include use of existing plant and machinery and all ancillary site works and services / 0.2 km away / 12 May 2026Granted
- 2460158The development will consist of A ten-year planning permission consisting of an extension to an existing quarry for the extraction of sand and gravel and all associated ancillary site works. The proposed extension of circa 2.21 hectares is on lands to the northwest of the quarry with an extractive area of circa 2.05 hectares. A Natura Impact Statement will also be lodged with this application. / 0.6 km away / 05 December 2024Granted
- 19686CONSTRUCT DWELLING HOUSE, DOMESITC GARAGE/FUEL STORE, SEPTIC TANK, TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ANCILLARY SITE WORKS / 0.7 km away / 22 October 2019Granted
- 19783CONSTRUCT NEW FOREST ACCESS ROAD ENTRANCE / 0.9 km away / 09 March 2020Granted
- 22882CONSTRUCTION OF 1 NO. BELL MOUTH ENTRANCE WITH ACCESS ROAD SO AS TO FACILITATE ACCESS INTO EXISTING FORESTRY PLANTATION FOR THE REMOVAL OF TIMBER AND ALL ANCILLARY WORKS / 0.9 km away / 26 July 2023Granted
- 18144CONSTRUCT EXTENSION TO EXISTING DWELLING HOUSE AND UPGRADE EXISTING SEPTIC TANK TO WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA AND ASSOCIATED SITEWORKS / 1.0 km away / 18 June 2018Granted
- 2560272We, ART Generation Limited, give notice of our intention to apply for permission for a renewable energy project in the townlands of Tonregee and Levallyroe, Ballyhaunis, County Mayo. The proposed development will consist of: • Construction of a single wind turbine with an overall ground to blade tip height of 156.5m, comprising rotor diameters of 133m and a hub height of 90m. • Construction of a permanent crane hardstand area and temporary laydown/storage area and turbine foundation. • Upgrade of existing access tracks and construction of new permanent site access tracks. • Development of a site drainage network including sediment control systems. • Construction of a permanent on-site 20kV on-site electrical substation, all associated electrical plant and equipment, security fencing and gates, all associated underground cabling and all ancillary structures and works. • All associated underground electrical and communications cabling connecting the wind turbine to the on-site substation. • Temporary construction compound and temporary site works. • Site signage, landscaping and all ancillary development. / 1.4 km away / 23 October 2025Granted