Bundorragha, Leenane, Co. Mayo
Planning application 23205
DecisionConditional grant
Decided08 September 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Mayo County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Mayo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Bundorragha, Leenane, Co. Mayo?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 21757RETAIN THE EXISTING 3M HIGH TIMBER POLE TELECOMMUNICATIONS SUPPORT STRUCTURE WITH DISHES AND ASSOCIATED TELECOMMUNICATIONS EQUIPMENT AND FENCING / 0.2 km away / 31 August 2021Granted
- 24533Retain an extension and alterations to an existing dwelling house / 0.3 km away / 12 May 2025Granted
- 19667For the construction of 5 individual one bedroom self contained "pods" of wooden construction for short term holiday usage, in an outdoor adventure environment. The development includes the construction of necessary access paths, water supply, and effluent disposal system to service same. Gross floor space of work: 5 x 49 = 245 sqm / 1.4 km away / 14 November 2019Granted
- 18480Of 233m of walking trail and permission for approximately 1300m of walking trail and a car park. / 1.5 km away / 17 July 2018Granted
- 25108Of 842m of walking trail with 275m2 of car park and 418m2 of an existing picnic area / 1.5 km away / 03 July 2025Granted
- 25605653. Planning Permission is being sought for construction of a photovoltaic ground-mounted solar array, mounted on lightweight galvanised frames. The works to include a 175m long underground trench to connect the solar array to the existing above-ground Plant Room. A Natura Impact Statement will be submitted to the Planning Authority with the application. The Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the relevant planning authority. / 1.6 km away / 12 March 2026Granted
- 20225For alterations and ancillary site works carried out on the existing boat shed (Previous Planning Reference No. 08/363). Gross floor space of works to be retained: 72 sqm / 1.9 km away / 16 April 2020Granted
- 2388To construct a terminal building incorporating a ticket office/waiting room, a manager's office, a kitchen, store, toilet facilities and effluent storage tank. Trade effluent produced on site will be transported, under licence, to the Irish Water Effluent Treatment Plant at Letter. A Statement for Screening for Appropriarte Assessment will be lodged with the application. Gross floor space of proposed works: 233 sqm / 1.9 km away / 22 February 2024Granted