Liscromwell, Castlebar, Co. Mayo
Planning application 2460383
DecisionConditional grant
Decided21 October 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Mayo County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Mayo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Liscromwell, Castlebar, Co. Mayo?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20241A DEPOSITION AREA FOR SURPLUS FILL MATERIAL (INERT SOIL AND SUBSOIL) ON A 4.65 HECTARE SITE. / 0.3 km away / 13 July 2020Granted
- 20160EXTRACTION AND PROCESSING OF ROAD CONSTRUCTION MATERIALS FOR THE PROPOSED N5 WESTPORT TO TURLOUGH ROAD AND TO REPLACE THE MATERIALS WITH INERT FILL FROM THE AFOREMENTIONED PROJECT (SURPLUS INERT SOIL AND SUBSOIL)ON A 2.95 HECTARE SITE. / 0.4 km away / 06 July 2020Granted
- 22596The development consists of the retention of a converted domestic garage granted under P98/1485 to habitable space, and the retention of the converted attic space over the original domestic garage for domestic use, including the dormer window installation / 0.6 km away / 09 September 2022Granted
- 2560820The proposed development which will consist of the following elements: the installation and operation of 1no. battery energy storage system compound containing battery energy storage containers, 1no. electrical substation and compound, connected to the national grid system via c. 50m of underground cable to the ESB Castlebar 38kV substation, electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road, associated ancillary site development, landscaping and reinstatement works. The operational lifespan of the development will be 35 years. The site of the proposed development has a total area of 0.89 hectares. / 0.7 km away / 12 March 2026Granted
- 24274Construct dwelling house and domestic garage with connection to existing public services together with associated site services / 0.7 km away / 22 October 2024Granted
- 18990CONSTRUCT DWELLING HOUSE, WASTE WATER TREATMENT SYSTEM, AND ALL ASSOCIATED SITE WORKS TO AMEND SITE BOUNDARY AND CHANGE OF HOUSE TYPE PREVIOUSLY GRANTED UNDER P08/1627 AND TIME EXTENSION GRANTED UNDER P08/16270 / 0.8 km away / 07 February 2019Granted
- 17265CONSTRUCT SLATTED HOUSE TOGETHER WITH ALL ANCILLARY SITE WORKS / 0.8 km away / 10 July 2017Granted
- 23641Construction of a dwelling house, tertiary wastewater treatment system, percolation area, mains water connection and associated site works / 0.8 km away / 24 July 2024Granted