John Moore Road, Castlebar, Co. Mayo
Planning application 2560004
DecisionConditional grant
Decided20 February 2025
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Mayo County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Mayo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near John Moore Road, Castlebar, Co. Mayo?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20573CHANGE OF USE FROM A TRAINING CENTRE TO MULTI USE BUILDING CONTAINING HUBS FOR USE BY PEOPLE WITH DISABILITIES A COMMUNITY SPACE AND OFFICE ACCOMMODATION, CONSTRUCTION OF NEW 1ST FLOOR OFFICES, CONSTRUCTION OF 3 NO. GROUND FLOOR EXTENSIONS, FOR ALTERATIONS TO EXISTING ELEVATIONS, RETENTION OF EXISTING GROUND FLOOR EXTENSION TO REAR AND ALL ASSOCIATED SITE WORKS AND SERVICES. / 0.0 km away / 12 October 2020Granted
- 18846CONSTRUCT EXTENSION AND REFURBISHMENT WORKS TO THE MORTUARY BUILDING ON THE GROUNDS OF MAYO UNIVERSITY HOSPITAL INCLUDING ALL ANCILLARY SITE WORKS, LANDSCAPING AND NEW SIGNAGE / 0.1 km away / 18 December 2018Granted
- 2360331A NEW MODULAR OFFICE BUILDING (252 SQ METRES). A NEW CANOPY ROOF OVER THE ENTRANCE TO THE ORIGINAL MAIN ENTRANCE (1940s BUILDING). A NEW GAS STORAGE COMPOUND, EXTERNAL STEPS AND PARKING. WORKS INCLUDED DRAINAGE WORKS TO CONNECT TO THE EXISTING SITE SERVICES AND ALL ANICLLARY SITE WORKS / 0.2 km away / 10 October 2023Granted
- 22627NEW CT SUITE AND ASSOCIATED ROOMS. THE PROJECT IS APPROXIMATELY A 140 SQ METRE SINGLE STOREY STRUCTURE WITH ROOFTOP PLANT AND WILL BE LOCATED WITHIN AN EXISTING COURTYARD CENTRAL TO THE HOSPITAL CAMPUS FACING SOUTH EAST. THE WORKS INCLUDE DRAINAGE, WORKS TO THE EXISTING STREET, AND ALL ANCILLARY SITE WORKS / 0.2 km away / 21 September 2022Granted
- 2360530The development will consist of a new two storey extension with rooftop plantroom to the existing courtyard forming the expansion of the Emergency Department at Ground Floor and a new Acute Medical Admissions Unit at First Floor. At ground floor level the existing Emergency Department will be refurbished as part of the works this will include a new dedicated Paediatric area, refurbished resuscitation facilities and minor injuries facilities. The extension will provide additional patient cubicles, patient isolation facility, Gynaecology treatment suite and associated staff and clinical support facilities. A single storey extension will also be formed in the courtyard providing support accommodation for the emergency department. At first floor level in the Acute Medical Admissions Unit, new patient cubicles will be provided with patient sit-down treatment area, triage and consultation rooms and staff support facilities. Accessible ensuite patient rooms will also be provided at this level. Upgrades to existing roof areas will be carried out to allow for the installation of new Solar PV arrays. In addition, window replacement and architectural cladding will provide enhanced thermal fabric performance. The project will be undertaken in a multiphase approach and the provision of temporary and relocation of temporary prefabricated accommodation will be required to facilitate same. A single storey extension will be formed to provide a new Ambulance Entrance, with works carried out to the existing Ambulance Drop-Off / Set-Down area providing increased Emergency Vehicle capacity. Expansion of the existing car park will be undertaken with installation of helipad safety barriers, EV charging points and bicycle parking. Site-wide signage will be erected to provide clear wayfinding and health and safety information for the campus and all other necessary ancillary site works. / 0.2 km away / 09 February 2024Granted
- 17291DEMOLISH EXTENSION TO EXISTING HABITABLE HOUSE AND EXTEND AND RENOVATE EXISTING DWELLING HOUSE, TOGETHER WITH ALL ANCILLARY SITE WORKS / 0.2 km away / 15 June 2017Granted
- 2460166The development will consist of the relocation and modification of the existing Temporary Covid Modular Building and all other necessary ancillary site works. Site-wide signage will be erected to provide clear way finding and health and safety information / 0.2 km away / 08 May 2024Granted
- 1937DEMOLITION OF PART OF THE EXISTING GROUND FLOOR, THE DEVELOPMENT OF ATTIC SPACE INTO HABITABLE ROOMS THROUGH RAISING THE EXISTING RIDGE HEIGHT, RENOVATION OF THE REMAINING GROUND FLOOR, THE CONSTRUCTION OF STORAGE SHED IN THE REAR GARDEN AND ALL ANCILLARY SITE WORKS / 0.3 km away / 11 March 2019Granted