St. Paul's Primary School, Abbeylands, Navan Co Meath
Planning application 21966
DecisionConditional grant
Decided12 July 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Meath County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Meath has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near St. Paul's Primary School, Abbeylands, Navan Co Meath?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- NA200979The construction of a hurling/kick wall located to the front of the previously approved school development (planning Ref. NA151116) / 0.1 km away / 11 September 2020Granted
- NA181016Retention permission for 1 no. existing prefabricated modular unit serving as resource/classroom associated with the existing National School, including conection to services and all ancillary site works / 0.1 km away / 22 October 2018Granted
- NA171047Retention permission for 2 no. existing relocated prefabricated modular units serving as resource/classroom associated with the existing National School, including connection to services and all ancillary works / 0.1 km away / 27 October 2017Granted
- 23952A one-story extension to the rear and side of the existing dwelling, including a carport, internal alterations and all associated site works, all connected to existing onsite services / 0.1 km away / 27 November 2023Granted
- 2560933The development consists of retention of a single storey extension to the side of dwelling which comprises of a garage and utility room. The development also consists of retention of a detached domestic metal garden shed located to the rear of the dwelling and for all associated site works and services / 0.1 km away / 24 October 2025Granted
- NA181475The installation of a 150m2 solar PV array on previously approved school development (planning Ref. NA151116) / 0.1 km away / 11 February 2019Granted
- 211367The installation of a 0.50m x 0.87m x 1.62m (LxWxH) above ground enclosure, to house a new natural gas District Regulating installation and a 3m high 'lamp post' style relief vent stack servicing the new installation with all ancillary services and associated site works / 0.1 km away / 08 September 2021Granted
- NA201145Retention to existing fully serviced two storey Childcare Facility for the following rooms. Retention for change of use of the old kitchen to new staff room and old staff room to new kitchen on ground floor - changed in size and position, addition of reception area under front stair. Retention for change of use of Montessori room, originally a staff room and sleep area on first floor with minor alterations to first floor to allow corridor to playroom. All alterations from original planning permission design. Permission is requested to allow a maximum of 55 children to occupy the facility in the morning sessions and 57 children in the afternoon-evening sessions. The opening hours are 8am to 6pm Monday to Friday / 0.1 km away / 16 October 2020Granted