Towas, Kilmainhamwood Kells, Co. Meath
Planning application 2560366
DecisionConditional grant
Decided29 October 2025
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Meath County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Meath has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Towas, Kilmainhamwood Kells, Co. Meath?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Source documents
Original council portal records and source PDFs where available.Included in site brief
1 council document — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- 2561141The development will consist of the following: (1) Retention permission for single storey extension to side of existing single storey dwelling and Planning permission as to complete the development (2) All ancillary site development works / 0.1 km away / 15 December 2025Granted
- 2460408To construct a two storey detached dwelling, detached domestic garage, new vehicular entrance onto public roadway, driveway, waste water treatment system, percolation area, landscaping, boundaries and associated site works / 0.4 km away / 07 August 2024Granted
- 22811The construction of a part single, part two storey detached, replacement, dwelling house, the existing single storey detached cottage to be replaced to be refurbished and utilised as ancillary/incidental accommodation to the proposed house. The existing single storey detached dwelling/home to be demolished. New proprietary wastewater treatment unit and percolation area to replace the existing septic tank. Two existing agricultural sheds to be demolished, along with all associated services, service connections, landscape and site development works / 0.5 km away / 17 April 2023Granted
- KA181375Construct a two storey detached dwelling, detached domestic garage, new vehicular entrance onto existing public roadway, driveway, wastewater treatment system and polishing filter, landscaping and associated site works. / 0.5 km away / 22 January 2019Granted
- 2560528For construction of a two storey detached dwelling, detached domestic garage, new vehicular entrance onto private laneway, driveway, waste water treatment system, percolation area, landscaping and associated site works / 0.6 km away / 02 October 2025Granted
- KA171413Retention of a revised first floor layout, elevational changes and all associated site works all further to that granted under planning reference KA/40058. Significant further information/revised plans submitted on this application / 0.6 km away / 26 June 2018Granted
- KA180003Development will consist of the following: (A) To demolish a habitable dwelling house and a domestic shed. (B) To construct a replacement split-level dwelling house, and a detached domestic garage. (C) To use the existing public mains water and sewage connections which serves the existing dwelling to serve the new replacement dwelling. (D) To close up the existing entrances to the site and to construct a new recessed type front entrance along with entrance walls, gates and piers. (E) All ancillary site development works. Significant further information/revised plans submitted on this application / 0.6 km away / 09 July 2018Granted
- 2595The development will consist of construction of New Slatted Shed and all works ancillary to the overall development on site / 0.7 km away / 04 September 2025Granted