Chestnut Daycare LTD., The Rise Baker Hall, Navan Co. Meath C15 ERY6
Planning application 2560599
DecisionConditional grant
Decided05 August 2025
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Meath County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Meath has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Chestnut Daycare LTD., The Rise Baker Hall, Navan Co. Meath C15 ERY6?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 221309The proposed development consists of the demolition and clearance of a single storey building (236.9 sqm - except for the north-eastern boundary wall that is proposed to be retained) and the construction of 22 no. dwellings together with associated works, all on lands within the curtilage of Belmount House (a protected structure - RPS ID 90938). The existing render finish on the retained wall is to be removed, with the exposed stonework to be repaired and repointed. Existing window and door openings along the retained wall are to be infilled and finished to match the exposed and repaired stonework. The proposed 22 no. dwellings will comprise: • 4 no. four bed, semi-detached, three storey houses (Type F2); • 4 no. three bed, corner end terrace, two storey houses (Type F); • 2 no. three bed, end terrace, two storey houses (Type D); • 10 no. three bed, mid terrace, two storey houses (Type D2); and • 2 no. two bed, mid terrace, two storey houses (Type E8). The proposed development includes public open space provision (1,558 sqm) and a play area; car parking spaces; bicycle parking spaces; internal roads; boundary treatments; bin storage; public lighting; services infrastructure; drainage infrastructure and all ancillary site and development works. The proposed development also amends and integrates with the residential development currently under construction to the north, south and west of the site, permitted under An Bord Pleanala Ref. ABP- ABP-306021-19. The proposed development includes all service and drainage connections to the permitted development, together with the provision of a vehicular and pedestrian connection onto the permitted roadway along the southwestern boundary of the subject site, the associated relocation of 8 no. permitted car parking spaces along this roadway, and a pedestrian connection to the permitted open space area along the eastern boundary. This application is accompanied by a Natura Impact Statement (NIS). Significant further inforamtion/revised plans submitted on this application / 0.1 km away / 04 May 2023Granted
- 2571EXTENSION OF DURATION OF PLANNING PERMISSION ABP Ref: 306021-19. (SHD) The construction of a residential development of 544 no. dwellings, 2 no. creches & open space areas as follows: A) 260 no. houses comprising; 18 no. 2 bed houses, 207 no. 3 bed houses, 35 no. 4 bed houses B) 198 no. apartments in 5 no. buildings (Block A - 5 storeys with a 6 storey setback, Block B – 6 storeys, Block C – 5 storeys, fronting onto Academy Street, Block D – 3 and 4 storeys & Block E – 4 storeys) comprising 46 no. 1 bed apartments & 152 no. 2 bed apartments; C) 15 no. 2 bed duplex apartments & 15 no. 3 bed duplex apartments in 3 no. 3 storey buildings; D) 8 no. 5 dwelling 3 storey corner blocks (each comprising, 1 no. 1 bed apartment, 2 no. 2 bed apartment & 2 no. 3 bed units) – 40 no. units in total; E) 2 no. 8 dwelling 3 storey corner blocks (each comprising 4 no. 1 bedroom and 4 no. 2 bedroom units) – 16 no. units in total; F) Provision of 2 no. creches, ESB kiosks, associated single storey bicycle storage & refuse storage buildings; G) Provision of open space within the development (including playground areas & communal open space areas); H) Access from 3 no. new junctions onto Academy Street, & a new pedestrian access onto the Dublin Road (R147) at the southern end of the site, includes new signalised junction & improvements on the Dublin Road (R147), also 875 no. car parking spaces and 581 no. cycle spaces (northern vehicular access to also facilitate future adjoining school site campus). Proposed works to the former access road to Belmount House (a protected structure) as well as landscaping works to associated woodland area; I) Surface water & underground attenuation systems. J) Temporary marketing signage for a period of 3 years (located on Academy Street); K) All associated site development & landscape works all on a site of c. 15.1 hectares; Also contains a statement setting out how the proposal is consistent with the the relevant development plans (Meath County Development Plan 2013-2019 & Navan Development Plan 2009-2015) & a statement indicating why permission should be granted for the proposed development, having regard to section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. An EIAR and NIS have been prepared in respect of the proposed development. / 0.1 km away / 12 June 2025Granted
- NA201080A ground floor extension to the side and rear of the existing dwelling & all associated site works / 0.2 km away / 01 October 2020Granted
- NA190020Permission to replace existing 12.4m high telecoms structure with a 21m high lattice communication structure, carrying communication dishes and antennae within an existing 2.4 metre high fenced compound / 0.2 km away / 06 December 2019Granted
- 221258The construction of 2 no. apartment units and all associated bicycle storage, plant room, landscaping, car parking, and site development works. The proposed development will result in alterations to the Strategic Housing Development previously permitted under An Bord Pleanala Ref: 306021-19, to replace the permitted creche and internal bicycle storage with 2 no. apartment units and associated plant room. Belmount House (a protected structure) is located adjacent to the subject site / 0.2 km away / 16 November 2022Granted
- 2460509The development will consist of: (A)- The Construction of a split-level building with part single-storey and part three-storey school for Árd Rí Community National School comprising of teaching spaces, ancillary spaces, physical education hall facility, special education needs unit, general purpose hall, social areas, library, administration areas, toilet and changing facilities, external stores, and associated ancillary accommodation with a total internal area of circa 3,591.00m². (B)- The Construction of a two-storey building for St. Ultan’s Special School comprising of teaching spaces, ancillary spaces, physical education hall facility, special education needs suite, general purpose hall, social areas, library, administration areas, toilet and changing facilities, external stores, and associated ancillary accommodation with a total internal area of circa 4,359.20m², Additionally, the development will include all associated site works such as car parking, bicycle parking, shared sports facilities, playing areas, open spaces/landscaping, plant, bin stores, site services, and connections to facilitate the development. There will also be vehicular and pedestrian access to the development via Baker Hall along with additional pedestrian access points to the north and west. Significant further information/revised plans submitted on this application / 0.2 km away / 10 July 2025Granted
- NA190633Permission for revised opening hours until 6pm, for the part of the existing creche facility at former Apt 123 at / 0.2 km away / 14 January 2020Granted
- NA181585Existing 3 no. 1.3m high antennae, 1 no. 0.3m dish on existing 21 metre high lighting structure, equipment cabinet and associated equipment within a fenced compound. The development forms part of Vodafone Ireland Ltd's existing GSM and 3G Broadband telecommunications network. / 0.2 km away / 08 February 2019Granted