AA201035: The construction of a two storey residence, proprietary waste water treatment system, domestic garage, new entrance and all associated site development works
Lacystown, Stamullen, Co. Meath
DecisionConditional grant
Decided17 September 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Meath has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Lacystown, Stamullen, Co. Meath?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- AA190741Dwelling house, wastewater treatment system and percolation area and detached domestic garage and all associated site works. Significant further information/revised plans submitted on this application / 0.0 km away / 07 February 2020Granted
- AA170597Construction of a two storey dwelling, effuent treatment system and associated site works / 0.1 km away / 21 August 2017Granted
- 2560479Dwelling house, waste water treatment system and percolation area, access to site via existing entrance gate and all associated site works / 0.1 km away / 05 August 2025Granted
- LB201200The demolition of existing rear conservatory and construction of a new rear ground floor extension including ensuite bathroom & walk in wardrobe, a 2 storey side extension to include kitchen/dining/living area, Utility and Mud Room, Den/ TV Room at ground floor, Master Bedroom Suite and Home Office at first floor level and associated site works, including the provision of a proposed wastewater treatment system and soil polishing filter all to existing single storey detached dwelling / 0.3 km away / 27 October 2020Granted
- AA180750The re-contouring of agricultural land and associated site works using imported clean inert soil and stones within an area of a farm holding of 5.923 hectares (plus the additional access roadway of 0.203 hectares) for the consequential benefit to agriculture. A 5 year planning permission is requested, and during this period 98,043 tonnes of inert soil and stones will be imported for the purposes of land reclamation / 0.4 km away / 24 August 2018Granted
- 24246The development will consist of the extension to the existing authorised land reclamation works as granted under planning permission AA/180750 and as extended in duration by 23/581 using the same site entrance, site access roadway (0.651 Hectares), wheelwash, portable office and chemical toilet. The proposed works will involve the re-contouring of agricultural land using imported byproduct soil and stones within an area of a farm holding of 5.557 for the consequential benefit to agriculture and all associated site works. A 5 year planning permission is requested and during this period 99,471 tonnes of byproduct soil and stones will be imported for the purposes of land reclamation subject to a maximum of 25,000 tonnes per annum / 0.4 km away / 26 July 2024Granted
- 23581EXTENSION OF DURATION OF PLANNING PERMISSION AA/180750 - the re-contouring of agricultural land and associated site works using imported clean inert soil and stones within an area of a farm holding of 5.923 hectares (plus the additional access roadway of 0.203 hectares) for the consequential benefit to agriculture. A 5 year planning permission is requested, and during this period 98,043 tonnes of inert soil and stones will be imported for the purposes of land reclamation / 0.4 km away / 26 July 2023Granted
- LB171285The development will consist of land reclamation using inert soil and stones. The proposed works will be subject to a waste management permit for the recovery of <25,000 tonnes per annum for a period of c. 5 years, not to exceed 100,000 tonnes in total. A temporary wheelwash, portable office and chemical toilet and other ancillaries will be provided for the duration of the works / 0.5 km away / 21 December 2017Granted