Milltown, Cortown, Kells Co. Meath
Planning application KA180882
DecisionConditional grant
Decided27 September 2018
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Meath County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Meath has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Milltown, Cortown, Kells Co. Meath?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- KA181305Revised site boundaries and site layout from that previously granted under planning ref no. KA/180882 / 0.0 km away / 18 December 2018Granted
- KA201226Construction of a part two storey part single storey dwelling, domestic garage, proprietary treatment unit and all ancillary site works / 0.0 km away / 28 October 2020Granted
- 2460134The development will consist of: A 10-year permission for the development of a solar farm on a site of 35.81 hectares consisting of the following: 211,320 sqm of solar photovoltaic panels on ground mounted steel frames; 6 hardstanding locations for electrical skids; new internal access tracks; underground power and communications cables and ducts; a new access from the L6835 public road; access gates; landscaping and biodiversity enhancement measures; boundary fencing and all associated ancillary development, site works and services. The solar farm will be operational for 40 years. Installation of underground electrical cabling and associated infrastructure within the public road corridor along the L6835 public road for approximately 10 metres to connect into the permitted underground cabling associated with the permitted ‘Milltown Solar Farm (Meath County Council Reg. Ref. 21396 & An Bord Pleanála Case Number: PL17.311460) which is located to the north of the site within the townland of Milltown. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application / 0.5 km away / 19 April 2024Granted
- 21396The development consists of a 10 year permission and 35 year operation for a solar farm on two sites: North Parcel (Milltown Townland) approximately 41.2 hectares; South Parcel (Moyagher Lower Townland) approximately 80.3 hectares for a total site area of approximately 121.5 hectares. The proposed development on these two sites comprises; Up to 734,000 sq.m of solar photovoltaic panels on ground mounted steel frames, inverter/transformer stations, underground power and communication cables and ducts, boundary security fencing, new internal access tracks, associated drainage infrastructure, new site entrances to the L6835 public local road (North Parcel) and the L8003 public local road (South Parcel), 1 no vehicle passing area on lands adjoining the L6835 local road, CCTV cameras and all associated site services and works. Provision of control building and associated compound within the South Parcel. As part of a separate Strategic Infrastructure Development (SID) planning application, provision of 110KV electrical substation with electrical control building, associated compound with palisade fence and 2 no. overhead line masts, which is to be located within the North Parcel, will be lodged with An Bord Pleanala in due course. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the Application. Significant Further information/Revised plans submitted on this application / 0.7 km away / 31 August 2021Granted
- 2460194Permission to construct a single storey dwelling house, domestic garage, new entrance and install a sewage treatment system with percolation area together with all associated site development works on site / 0.8 km away / 09 May 2024Granted
- 2360305To construct a single storey dwelling house, domestic garage, new entrance and install a sewage treatment system with percolation area together with all associated site development works on site at. Significant Further Information / Revised Plans received on this application. / 0.8 km away / 04 October 2024Granted
- KA180905(a) demolition of flat roofed extension to rear of existing dwelling, (b) demolition of sheds to rear of existing dwelling, (c) construction of a single storey extension to rear of existing dwelling, (d) renovations to existing dwelling, (e) construction of domestic garage, (f) installation of effluent treatment system and percolation area and (g) all associated site development works. Significant Further information / Revised plans submitted on this application. / 1.1 km away / 29 November 2018Granted
- 21162EXTENSION OF DURATION OF PLANNING PERMISSION REF. NO. KA151242 - development will consist of a storey and a half style dwelling, a detached domestic garage, a septic tank and percolation area, upgrade of existing agricultural site entrance to a domestic site entrance and all associated site / 1.1 km away / 23 March 2021Granted