Colehill, Kinnegad, Co. Meath
Planning application TA180766
DecisionConditional grant
Decided12 April 2019
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Meath County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Meath has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Colehill, Kinnegad, Co. Meath?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- TA180455Construction of dormer sytle extension to the east side of the existing dwelling house and any associated site works / 0.5 km away / 26 November 2018Granted
- TA190067The demolition of an existing rear extension, construction of a new extension to the rear of the existing dwelling house, and all associated site works / 0.5 km away / 20 March 2019Granted
- 2460382Planning permission to extend our existing dwelling at the rear and side to include on ground floor a kitchen, dining, Utility, bathroom and stairs, two bedrooms with a bathroom and to replace window at front instead of the front door and to construct a new porch at the side and to demolish chimney at the rear and on the first floor a Gym, Storage, study and landing with velux and to remove plaster on front of house to expose the stone and to replace the existing roof and increase the roof pitch and to demolish existing shed at the side and to decommission existing septic tank & percolation area and to install a new treatment system & percolation area with all ancillary site works / 0.6 km away / 16 July 2024Granted
- 2560406The development will consist of the construction of a two storey dwelling, detached domestic garage, a domestic wastewater disposal system, new site entrance and all associated site works / 0.7 km away / 10 June 2025Granted
- TA190929Planning permission to erect new dwelling house, septic tank/treatment system, percolation area, storage shed and ancillary site works / 0.9 km away / 03 September 2019Granted
- TA190924A) Retention of Hay Barn B) Retention Of Calf House C) Construction farmyard entrance and access road D) Construction of milking parlour, dairy, collecting yard and associated underground slatted tank E) Construction of roofed cubicle shed with associated underground slurry tank F) Erection of external meal bin, milk storage tank & water storage tank and all associated site works. Please Note: This site lies within the curtilage of a protected structure(s). Significant further information/revised plans submitted on this application / 1.2 km away / 24 October 2019Granted
- TA170497The development consists of permission to retain nursing home extension in so far as it differs from that granted under planning permission file reference number TA/111083, retention permission is also sought for firefighting water storage tank, new boiler house, revised car-parking layout and all associated site development and civil works. Significant further information/revised plans submitted on this application / 1.4 km away / 18 December 2017Granted
- 2460819The development will consist of planning permission to construct new milking parlour, new cubicle shed, new soiled water storage tank, new silage slab, new meal bin and ancillary site works / 1.6 km away / 21 March 2025Granted