Ballynure, Newbliss, Co. Monaghan
Planning application 2073
DecisionConditional grant
Decided25 August 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Monaghan County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Monaghan has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballynure, Newbliss, Co. Monaghan?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 18169Permission to construct 1 no. two storey dwelling, alterations to existing entrance, provision of mechanical effluent treatment system with associated percolation area and all ancillary site works / 0.2 km away / 24 August 2018Granted
- 1978Retention planning permission for alterations to the site boundary, design and location of the constructed free range laying hen house with attached store, underground washings collection tank, associated concrete aprons, meal bin etc. previously granted under permission 08/676 / 0.2 km away / 16 April 2019Granted
- 1895Permission to construct a Free Range Laying Hen House with attached egg/equipment stores and manure elevator, associated underground washings storage tank, concrete aprons, meal bins and all associated site works to include site access lane and site entrance / 0.4 km away / 18 May 2018Granted
- 18390Permission to construct a single storey agricultural machinery storage shed in existing yard together with all ancillary site works / 0.5 km away / 02 October 2018Granted
- 2048Permission to retain as constructed changes to previously approved dwelling ref. P03/259 namely to retain all elevational changes, retain conversion of attached domestic garage to living room and also construct first floor extension to the side of above mentioned dwelling along with a new domestic double garage, together with all ancillary site works / 0.7 km away / 23 March 2020Granted
- 20397Permission to erect a bio mass boiler house and woodchip store adjacent to existing poultry units and use existing entrance onto public road / 0.9 km away / 01 April 2021Granted
- 239001Permission to construct 2 No. poultry houses together with all ancillary structures (to include meal bins(s), and soiled water tank(s)) and ancillary site works (to include a new/upgraded site entrance) associated with the above development. This application relates to a development, which is for the purposes of an activity requiring a Licence under part IV of the Environmental Protection Agency (Licensing) Regulations 1994 to 2013. An Environmental Impact Assessment Report (EIAR) will be submitted with this application / 1.3 km away / 02 June 2023Granted
- 18359Permission to construct 2 No. poultry houses together with all ancillary structures (to include meal bins(s), and soiled water tank(s)) and ancillary site works (to include a new/upgraded site entrance) associated with the above development. This application relates to a development, which is for the purposes of an activity requiring a Licence under part IV of the Environmental Protection Agency (Licensing) Regulations 1994 to 2013. An Environmental Impact Assessment Report (EIAR) will be submitted with this application / 1.3 km away / 17 September 2018Granted